Installation Guide
Questions? (888) 788-2254
www.CaliFloors.com
Cali Vinyl Pro Classic Flooring Installation Guide
Glue Down Luxury Vinyl Pro Plank Installation (Pages 11-16)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliFloors.com
Pre-Installation
1/4” Expansion Gap
1/4” Spacer
Baseboard
P ACE
EXPANSION
GAPS
-25-165°F
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier on concrete suboors or
a vapor barrier on plywood. (Required adhesive will act as
moisture/vapor barrier.)
Required Adhesive will act as Moisture Barrier
PA CE
ACCLIMATE
FLOORING
No Acclimation Needed.
PACE
PREPARE
THE SUBFLOOR
Leave at least 1/4” expansion spaces between ooring
and ALL vertical objects (walls, cabinets, pipes, etc.)
Large ooring runs may require additional expansion
space. Undercut door jambs and casings to provide
adequate expansion space. Cali Bamboo® does not
recommend screwing or nailing cabinetry or other
permanent xtures to the ooring.
Vinyl ooring can be used in areas ranging
from -25°F to 165°F.
Page 12