Installation Guide

Questions? (888) 788-2254
www.CaliFloors.com
Cali Vinyl
®
Pro with Mute Step
®
Flooring Installation Guide
Page 5
Floating Click-Lock Luxury Vinyl Pro with Mute Step Plank Installation
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliFloors.com
Pre-Installation
P ACE
EXPANSION
GAPS
Vinyl ooring can be used in areas ranging from
-25°F to 140°F.
Leave at least 1/4” expansion spaces between ooring and
ALL vertical objects (walls, cabinets, pipes, etc.) Large ooring
runs may require additional expansion space. Undercut door
jambs and casings to provide adequate expansion space. Do
not screw or nail cabinetry or other permanent xtures to a
oating oor.
-25-140°F
1/4” Expansion Gap
1/4” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete suboors or Silicon Vapor Shield on plywood.
Use 6mil Plastic on Concrete
PA CE
ACCLIMATE
FLOORING
PACE
PREPARE
THE SUBFLOOR
No Acclimation Needed.