Installation Sheet
SH-20-XX_ii_120711 Pg 1
SH-20-XX
(XX = Series Style for CF Faucets Sets)
Handshower Wall Bracket
Installation Instructions
1
2
3
CALIFORNIA FAUCETS RECOMMENDS THAT ALL PLUMBING PRODUCTS BE INSTALLED
BY A LICENSED PROFESSIONAL
IMPORTANT: Read all instructions prior to installation and provide copy of instructions to consumer.
PRE-DRILL OF WALL FOR SCREW ANCHOR
• Determine desired location of handshower wall bracket on
finished wall surface
• Using appropriate drill bit drill Ø 3/16” hole in finished wall
• Insert ANCHOR (1) into drilled hole
MOUNTING BRACKET TO WALL
DRILL
• Removing HOOK (4) from BODY (2)
Ø 3/16”
• Insert SCREW (3) into BODY (2) and securely tighten
SCREW (3) into ANCHOR (1)
• Some styles may have sliding flange, this flange shall be slide
back to finished wall after body is secured to wall
ATTACHING HOOK TO BODY
• Attach HOOK (4) to BODY (2)
• Rotate HOOK (4) completely into BODY (2)
• When HOOK (4) seats against BODY (2), HOOK (4)
MUST
be rotate so that large diameter is toward top
• Tighten SETSCREW (5) with hex KEY (6) provided
HOOK LARGE DIAMTER
MUST
BE TO TOP SIDE
www.calfaucets.com
5271 Argosy Ave. Huntington Beach, CA 92649
800-822-8855