Installation Sheet

CF-KXX-110_ii_150901 Pg 2
2
WATER CONNECTIONS
Important: The water supplies MUST be flush of all debris prior to
running water through the faucets SPRAYHEAD (8); the following
procedure will ensure debris removal.
Tighten red colored nut on HOT INLET HOSE
(4a) to HOT SUPPLY (9a)
Tighten blue colored nut on COLD INLET HOSE
(4b) to COLD SUPPLY (9b)
Ensure that faucet HANDLE (10) is in closed
position as shown (straight up)
Turn on HOT and COLD SUPPLIES (9a) & (9b)
Place BUCKET (11) (not supplied) under SHANK
(1a)
Slowly open HANDLE (10) on faucet and cycle
through cold and hot water until water runs clear
HOT
supply
COLD
supply