User's Manual

Table Of Contents
67
7 Installation
Motorola recommends that only qualified personnel undertake the installation of a PTP 600
Series Bridge solution.
7.1 Preparation
Before proceeding with the installation you should:
Check the contents of all packages against the parts lists shown in the packing list.
Ensure that you have the correct tools for the job.
Ensure that you are qualified to undertake the work.
Ensure that you have taken the correct safety precautions.
Have completed the site planning as described in Section
1024H6 “Site Planning”.
7.2 Installation Procedure
The 600 Series installation procedure consists of the following steps:
Mounting the ODUs, Section
1025H7.6
Connecting up, Section
1026H7.7
Mounting the PIDU Plus units, Section
1027H7.7.8
Powering Up, Section
1028H7.7.10
Aligning the ODUs, Section
1029H7.7.11
7.3 Tools Required
The following specific tools are required to install a PTP 600 Series Bridge in addition to
general tools:
13mm Spanner / Wrench
RJ45 Crimp Tool
IBM Compatible Personal Computer (PC) running Windows 98 or later with 10, 100 or
1000 BaseT Ethernet (Ability to change IP settings easily is recommended)
Either Internet Explorer version 6 or higher, or FireFox 1.5 or higher are recommended.
Ethernet patch cable
6mm general purpose crimp tool for the grounding lug (optional for Lightning Protection)