User's Guide Part 1
Table Of Contents
- Cambium PTP 700 Series User Guide
- Contents
- About This User Guide
- Contacting Cambium Networks
- Purpose
- Cross references
- Feedback
- Important regulatory information
- Radar avoidance
- USA and Canada specific information
- Renseignements specifiques aux USA et au Canada
- EU Declaration of Conformity
- Application firmware
- Specific expertise and training for professional installers
- Avoidance of weather radars
- External antennas
- Antennas externes
- Ethernet networking skills
- Lightning protection
- Training
- Problems and warranty
- Security advice
- Warnings, cautions, and notes
- Caring for the environment
- Chapter 1: Product description
- Overview of the PTP 700 Series
- Wireless operation
- Ethernet bridging
- TDM bridging
- System management
- FIPS 140-2 mode
- Chapter 2: System hardware
- Outdoor unit (ODU)
- Power supply units (PSU)
- Antennas and antenna cabling
- Ethernet cabling
- PTP-SYNC unit
- GPS receiver
- Network indoor unit (NIDU)
- Chapter 3: System planning
- Typical deployment
- Site planning
- Grounding and lightning protection
- Lightning protection zones
- Site grounding system
- ODU and external antenna location
- ODU ambient temperature limits
- ODU wind loading
- Hazardous locations
- PSU DC power supply
- PSU location
- PTP-SYNC location
- GPS receiver location
- NIDU location
- Drop cable grounding points
- LPU location
- Multiple LPUs
- Radio spectrum planning
- Link planning
- Planning for connectorized units
- Configuration options for TDD synchronization
- Data network planning
- TDM network planning
- Network management planning
- Security planning
- System threshold, output power and link loss
- Data throughput capacity tables
- Chapter 4: Legal and regulatory information
- Cambium Networks end user license agreement
- Definitions
- Acceptance of this agreement
- Grant of license
- Conditions of use
- Title and restrictions
- Confidentiality
- Right to use Cambium’s name
- Transfer
- Updates
- Maintenance
- Disclaimer
- Limitation of liability
- U.S. government
- Term of license
- Governing law
- Assignment
- Survival of provisions
- Entire agreement
- Third party software
- Compliance with safety standards
- Compliance with radio regulations
- Type approvals
- FCC/IC compliance
- FCC product labels
- Industry Canada product labels
- 4.9 GHz FCC and IC notification
- Utilisation de la bande 4.9 GHz FCC et IC
- 5.1 GHz FCC notification
- 5.2 GHz and 5.4 GHz FCC and IC notification
- Utilisation de la bande 5.4 GHz FCC et IC
- 5.8 GHz FCC notification
- 5.8 GHz IC notification
- 5.1 GHz band edge channel power reduction
- 5.2 GHz band edge channel power reduction
- 5.4 GHz band edge channel power reduction
- Réduction de puissance aux bords de la bande 5.4 GHz
- 5.8 GHz band edge channel power reduction
- Réduction de puissance aux bords de la bande 5.8 GHz
- Selection of antennas
- European Union compliance
- Cambium Networks end user license agreement
Chapter 4: Legal and regulatory information Compliance with radio regulations
5.8 GHz operation in the UK
The PTP 700 Connectorized product has been notified for operation in the UK, and when
operated in accordance with instructions for use it is compliant with UK Interface Requirement
IR2007. For UK use, installations must conform to the requirements of IR2007 in terms of EIRP
spectral density against elevation profile above the local horizon in order to protect Fixed
Satellite Services. The frequency range 5795-5815 MHz is assigned to Road Transport & Traffic
Telematics (RTTT) in the U.K. and shall not be used by FWA systems in order to protect RTTT
devices. UK Interface Requirement IR2007 specifies that radiolocation services shall be
protected by a Dynamic Frequency Selection (DFS) mechanism to prevent co-channel
operation in the presence of radar signals.
Page 4-40










