User's Guide Part 2

Mounting the ODUs Chapter 5 Installation
phn-0896_009v003
5-22
UNDER DEVELOPMENT
Feb 2010
3
Adjust the elevation and azimuth of the unit before tightening to the required
torque settings of 14 Nm (11 lb ft) for both bolts.
CAUTION
Attach the free end of one earth bonding lead (large tag M10) to the tower
metal work. On no account must this be attached to the mounting bracket
bolts.
The enclosure and mounting brackets of the PTP 600 Series product range are capable
of withstanding wind speeds up to 151mph (242kph). The installer should ensure that
the structure the bridge is fixed to is also capable of withstanding the prevalent wind
speeds and loads.