User's Manual

Table Of Contents
Chapter 5
phn-2182_002v000
May 2011
5-1
Chapter 5 Installation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
.
This chapter describes how to install the PTP 250 hardware,
To install the equipment at each PTP 250 link end, perform these tasks:
Preparing for installation on
page 5-2 describes the checks to be performed
before proceeding with the installation.
Installing the ODU on
page 5-5 describes how to install the ODU (integrated or
connectorized) on the supporting structure.
Installing connectorized antennas on page 5-9 des
cribes how to install separate
antenna(s) (only required for connectorized ODUs).
Installing the drop cable and LPU on page 5-14 des
cribes how to install the drop
cable from the ODU to the LPU and PoE power supply, and to provide grounding
for the installation.
Installing the PoE power supply on
page 5-27 describes how to install the PoE
power supply and connect it to the ODU and network cables.