User's Manual
Table Of Contents
- PTP 250 User Guide
- Copyrights
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1 Product description
- Chapter 2 Planning considerations
- Chapter 3 Legal information
- Chapter 4 Reference information
- Chapter 5 Installation
- Chapter 6 Configuration and alignment
- Chapter 7 Operation
- Chapter 8 Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance at the PoE end of the drop cable
- Testing the radio link
- Testing link end hardware
- Glossary
PTP 250 User Guide Preparing for installation
phn-2182_002v000
May 2011
5-3
Protection requirements
CAUTION
The installation must meet the requirements defined in Grounding and
lightning protection on page 2-11.
CAUTION
Apply the practices and procedures detailed in manual
R56 Standards And
Guidelines For Communication Sites
to all new site build activities. This
manual is available for download at www.motorola.com/ptp/software
.
Preparing personnel
IN NO EVENT SHALL MOTOROLA SOLUTIONS, INC. BE LIABLE FOR ANY INJURY
TO ANY PERSONS OR ANY DAMAGE CAUSED DURING THE INSTALLATION OF THE
MOTOROLA PTP 250.
Ensure that only qualified personnel undertake the installation of a PTP 250 link.
Ensure that all safety precautions can be observed.
Preparing inventory
Perform the following inventory checks:
• Check that an installation report is available and that it is based on the principles
described in Chapter 2 Planning considerations.
• Check
that the correct components are available, as described in Installation
i
nventories on page 4-2.
• Check
the contents of all packages against their packing lists.