User's Manual
Table Of Contents
- PTP 250 User Guide
- Copyrights
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1 Product description
- Chapter 2 Planning considerations
- Chapter 3 Legal information
- Chapter 4 Reference information
- Chapter 5 Installation
- Chapter 6 Configuration and alignment
- Chapter 7 Operation
- Chapter 8 Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance at the PoE end of the drop cable
- Testing the radio link
- Testing link end hardware
- Glossary
PTP 250 User Guide Installing the ODU
phn-2182_002v000
May 2011
5-5
Installing the ODU
Perform this task to install the ODU (integrated or connectorized) on the supporting
structure.
This task consists of the following procedures:
• Checks and safety precautions on pag
e 5-5
• Selecting a position for the ODU (connectorized) on
page 5-7
• Mounting the ODU on
page 5-7
If a connectorized ODU is being installed, see also:
• Installing connectorized antennas on page 5-9
Checks and safety precautions
WARNING
To prevent failure of the assembly, do not remove the mounting
bracket, and do not mount the ODU on a pole that is too narrow or
too wide.
WARNING
To minimize the risk of injury, do not attempt to hoist the ODU until
the necessary precautions have been taken.
WARNING
To prevent failure of the assembly, do not over-tighten the bolts.