User's Manual

Table Of Contents
PTP 250 User Guide Installing the drop cable and LPU
phn-2182_002v000
May 2011
5-25
9
Prepare the metal grounding point of the supporting structure to provide a
good electrical contact with the grounding cable:
Remove paint, grease or dirt, if present.
Apply the anti-oxidant compound liberally between the two metals.
Installing and grounding the drop cable at building entry
Perform this procedure to install and ground the drop cable and LPU at the building
(or cabinet) entry point (Figure 5-11).
Figu
re 5-11 Grounding at building entry