User's Manual
Table Of Contents
- PTP 250 User Guide
- Copyrights
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1 Product description
- Chapter 2 Planning considerations
- Chapter 3 Legal information
- Chapter 4 Reference information
- Chapter 5 Installation
- Chapter 6 Configuration and alignment
- Chapter 7 Operation
- Chapter 8 Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance at the PoE end of the drop cable
- Testing the radio link
- Testing link end hardware
- Glossary
Connecting link to the network Chapter 6 Configuration and alignment
phn-2182_002v000
6-34
May 2011
Comparing actual to predicted performance
For at least one hour of operation after disarming, monitor the link to check that it is
achieving predicted levels of performance.
To check performance, select menu option Status. The System Status page is
displayed (Figure 6-25). Monitor t
he following attributes:
• Link Loss
• Transmit Data Rate
• Receive Data Rate
For more information on these attributes, refer to Viewing the system status on
page
7-8.
PTP LINKPlanner provi
des the prediction in the form of an installation report.
Figure 6-25 System Status page