User's Manual
Table Of Contents
- PTP 250 User Guide
- Copyrights
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1 Product description
- Chapter 2 Planning considerations
- Chapter 3 Legal information
- Chapter 4 Reference information
- Chapter 5 Installation
- Chapter 6 Configuration and alignment
- Chapter 7 Operation
- Chapter 8 Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance at the PoE end of the drop cable
- Testing the radio link
- Testing link end hardware
- Glossary
PTP 250 User Guide Web-based management
phn-2182_002v000
May 2011
7-5
Table 7-1 Procedures performed from each menu option
Menu option Procedures
Home Viewing the system summary on page 7-6
Managing link status and alerts on page 7-15
Checking that the units are armed on page 6-25
Status Viewing the system status on page 7-8
Checking the installed firmware version on page 6-10
Configuration Reviewing system configuration attributes on page 6-31
LAN Configuration Reviewing system configuration attributes on page 6-31
Recovering a lost IP address on page 7-28
Date/Time Reviewing system configuration attributes on page 6-31
Save and Restore Saving the system configuration on page 6-11
Saving and restoring the configuration file on
page 7-24
Resetting to default configuration (without country reset)
on page 7-25
Statistics Checking system statistics on page 7-17
Comparing actual to predicted performance on
page 6-34
Test Ethernet packet errors reported by ODU on page 8-8
Channel Status Checking channel status on page 7-19
Retry Histogram Checking the retry histogram on page 7-20
Installation Wizard Using the installation wizard on page 6-14
Graphical Alignment Graphical alignment on page 6-29
Firmware Update Uploading a new firmware version on page 6-12
Diagnostics Plotter Using the diagnostics plotter on page 7-21
Change Password Changing password on page 7-14
Reboot PTP 250 Rebooting the unit on page 7-28
Logout Logging out on page 7-14