User's Guide

Table Of Contents
6 Installation
54
Figure 21 - ODU Mounted on Pole
3. Adjust the elevation and azimuth of the unit before tightening to the required torque
settings of 14 Nm (11 lb ft) for both bolts.
CAUTION
Attach the free end of the earth bonding lead (large tag M10) to the tower metal work.
On no account must this be attached to the mounting bracket bolts.
The enclosure and mounting brackets of the PTP 500 Series Bridge product range are
capable of withstanding wind speeds up to 200 mph (320 kph). The installer should ensure
that the structure the bridge is fixed to is also capable of withstanding the prevalent wind
speeds and loads. See Section 4.7 “Wind Loading”.