User's Manual

26
should follow the following instructions along with the cable and connector suppliers instruc-
tions:
Step 1: Assemble gland
on cable as shown
Step 2: Strip the outer insulation
Step 3: Arrange conductors as
shown in Figure 13 and cut to length
Step 4: Insert conductors and crimp
Figure 11 - Completed ODU connector
Both ends of the ODU to IDU cable are terminated in the same way. The above procedure should
be repeated for the IDU end of the cable when the cable routing process is complete.
Note: The IDU end of the cable does not employ a cable gland.