User's Manual

Network migration planning
Planning considerations
2-6
pmp-0047 (June 2013)
Deployment scenario 1 Replacing PMP 100 Equipment (20 MHz
Channel Bandwidth)
Deployment scenario 1 assumes that the existing network is comprised of PMP 1x0 equipment (i.e. PMP 100, PMP
120, etc.) with the configuration listed below in Table 10. The migration in this scenario results in a complete
replacement of PMP 1x0 series equipment with PMP 450 equipment.
Scenario 1 assumes that neighbouring frequencies are free and that a guard band is not required at the edges of the
spectrum used for transmission.
Table 10 Deployment scenario 1
Term
Definition
Existing System Release
11.2
Existing Number of Sectors
6
Existing Modulation
FSK
Existing Frequency Re-use Pattern
ABC ABC
Existing Ch BW (MHz)
20
Existing Aggregate Tower Throughput (Mbps)
84
Existing Total Bandwidth Used (MHz)
60
Existing Additional Frequencies Available (MHz)
10
Replace Legacy Subscribers with 450 SMs
Required
Resulting Number of Sectors
6
Resulting Modulation
OFDM (MIMO)
Resulting Frequency Re-use Pattern
ABC ABC
Resulting Ch BW (MHz)
20
Resulting Total Bandwidth Used (MHz)
60
Resulting Aggregate Tower Throughput (Mbps)
570
Resulting Percentage Increase in Aggregate Tower Throughput
679%