User's Manual
Table Of Contents
- Cambium
- PMP 450 Planning Guide
- Accuracy
- Copyrights
- This document, Cambium products, and 3rd Party Software products described in this document may include or describe copyrighted Cambium and other 3rd Party supplied computer programs stored in semiconductor memories or other media. Laws in the United ...
- Restrictions
- License Agreements
- High Risk Materials
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This Planning Guide
- PMP support website: http://www.cambiumnetworks.com/support
- Cambium main website: http://www.cambiumnetworks.com/
- Sales enquiries: sales@cambiumnetworks.com
- Email support: support@cambiumnetworks.com
- Telephone numbers:
- For full list of Cambium support telephone numbers, see:
- http://www.cambiumnetworks.com/support/contact-support
- Address:
- Chapter 1: Planning considerations
- Regulatory planning
- Network migration planning
- Site planning
- Link planning
- Analyzing the RF Environment
- Selecting Sites for Network Elements
- Diagramming Network Layouts
- Grounding and lightning protection
- Configuration options for TDD synchronization
- Data network planning
- Security planning
- Isolating APs from the Internet
- Managing module access by passwords
- Filtering protocols and ports
- Port Lockdown
- Isolating SMs
- Filtering management through Ethernet
- Allowing management from only specified IP addresses
- Configuring management IP by DHCP
- Planning for airlink security
- Planning for RF Telnet Access Control
- Forwarding Downlink PPPoE PADI packets
- Planning for RADIUS integration
- Planning for SNMP security
- Ordering components
- Chapter 2: Legal information
- Cambium Networks end user license agreement
- Acceptance of this agreement
- Definitions
- Grant of license
- Conditions of use
- Title and restrictions
- Confidentiality
- Right to use Cambium’s name
- Transfer
- Updates
- Maintenance
- Disclaimer
- Limitation of liability
- U.S. government
- Term of license
- Governing law
- Assignment
- Survival of provisions
- Entire agreement
- Third party software
- Hardware warranty
- Limit of liability
- Cambium Networks end user license agreement
- Chapter 3: Reference information
PMP 450 Planning Guide
Figure 26) and the equipment room is several floors below (Figure 27). The following additional requirements must
be observed:
• The AP must be below the lightning terminals and finials.
• A grounding conductor must be installed around the roof perimeter, to form the main roof perimeter lightning
protection ring.
• Air terminals are typically installed along the length of the main roof perimeter lightning protection ring
typically every 6.1m (20ft).
• The main roof perimeter lightning protection ring must contain at least two down conductors connected to the
grounding electrode system. The down conductors should be physically separated from one another, as far as
practical.
pmp-0047 (March 2014)
1-113