Owner's manual

3
STAGE 1
CIVIL & MECHANICAL SECTION
1.1 - Pre-Installation Check
BEFORE BEGINNING YOUR FERNI S GATE INSTALLATION CHECK THE
FOLLOWING:
THE GATE POST OR PIERS ARE STRONG ENOUGH TO SUPPORT THE GATE
AND THE MOTOR
THE GATE IS STRONG ENOUGH TO BE AUTOMATED.
THE GATE SWINGS FREELY FROM OPEN TO CLOSE AND THERE IS NO
FRICTION ON THE HINGS.
Fig 1
IF DISTANCE B IS 0 TO 300mm: DISTANCE A MUST BE AT LEAST 110mm.
IF DISTANCE B IS 300mm TO 380mm: DISTANCE A MUST BE AT LEAST
150mm.