Operating instructions

C8 Rotavator
Page 12 C8/0914
Service Information
Every Week
With the machine on a level surface, check the gearbox oil level, top up as necessary using the
correct oil as listed below. The gearbox oil level should reach between the two notches on the
dipstick
(g.2,C)
.
After the First 2 Weeks or 30 Hours of Work
Replace the gearbox oil lter ONLY,
(g.1,A),
part number 58056249.
Check the gearbox oil level using the dipstick
(gs.1&2,C)
,runthemachinefor2-3minutes
and recheck gearbox oil level, top up as necessary using the correct oil as listed below.
Every 100 Hours of Work or 12 Months
Change the gearbox oil by removing the gearbox drain plug
(g.3,B)
.
Replacethegearboxoillter
(g.1,A),
part number 58056249.
Cleanthegearboxdrainplugandret.
Fill gearbox using the correct oil and quantity as listed below.
Checkthegearboxoillevel,runthemachinefor2-3minutesandrecheckgearboxoillevel.
To replace the oil lter (g. 1, A)
1. Using the correct spanner, remove the
lter.
2. Smearalmofoilontherubbergasket
ofthenewlter.
3. Mount the new lter, screwing and
tightening by hand only.
Fig. 1
A
C