Manual
HUB-SDM5
3
FIGURE 2. HUB-SDM5 terminal strip connecting four SDM devices to a datalogger.
4.2 Wiring SDI-12 Devices
Before connecting the SDI-12 signal/power cable to the terminals, strip the
wire insulation back to expose ΒΌ inch of bare wire. Feed the cable through the
bulkhead fitting. Neatly separate the four wires into the following order, SDI-
12 data, SDI-12 power, SDI-12 ground, SDI-12 shield.
FIGURE 3. HUB-SDM5 connecting three SDI-12 devices
to a datalogger.
To SDI-12 sensor#1
To SDI-12 sensor#2
To SDI-12 sensor#3
SDM Devices
Datalogger or second
HUB-SDM5
SDM Data
SDM Clock
SDM Enable
SDM Ground
SDM Shield
Sealed
Bulkhead
Fitting
To
Datalogger