User Manual
VisualWeather
™
Software
7.3.2 Edit
To Edit a batch report that has already been created, select it in the list and
click the Edit butto n. The batch report will be loaded in the Report Selection
screen. Edit the selections an d click the Save Batch button. The ch anges will
be saved.
7.3.3 Run
All batch reports, including those set up as scheduled, can be run on demand.
Select the batch report you wish to run and click the Run button. The report
will be generated.
Running a scheduled batch report will not affect its schedule. If
you wish to edit the schedule of a batch report, edit the batch
report and change its generation time.
NOTE
7.3.4 Delete
To delete a batch report select it in the list and click th e Delete button. The
batch report will be deleted.
This action cannot be undone.
NOTE
8. Station Data
To view a graphical representation of the current weather conditions for all of
the stations in your network, select the Station Data heading
Each station is displayed on its own screen. The tabs at the top of the window
can be used to navigate between screens. The data displayed must be collected
through scheduled or manual collection. VisualWeather does not actively
collect data to be displayed by Station Data.
The data displayed will be based upon the sensors that were selected when the
weather station was configured (or, for a custom station, the Data Fields
associated with the Real Time Parameters when setting up the Real Time Field
Mapping). The units u sed will be based on the options chosen from
VisualWeather’s Tools | Options menu item.
The data is displayed as a project developed with Campbell
Scientific’s RTMC Pro Development software. The project file
is VW_Multistation.rtmc2 and is saved in
C:\CampbellSci\VisualWeather\RTMC. If y ou ha ve R TM C P ro , y ou
may make changes to this project (i.e., display additional
components). Once you have made changes to the project,
VisualWeather will not modify the proj ect. If you want to revert
to VisualWeather’s default project, you will need to delete the
project file. VisualW eather will then recreate the p roject the nex t
time Station Data is opened.
NOTE
25