User manual
SEC-HD user manual Testing the configuration
25
Testing the configuration
After configuring all the control elements (variable stages, relays, and so on), test your SEC-HD to
make sure the configuration is correct. In other words, make sure what you think is connected to a
particular relay or stage
is
actually connected to that relay or stage.
You can test the configuration using the SEC-HD's stage override mode. Stage override mode
allows you to operate the equipment, regardless of temperature or time. As you operate each piece
of equipment, visually check to see if that equipment is doing what you tell it.
For example, when you switch on stage 3 at the SEC-HD, does the equipment you think is
connected to that relay switch on?
For more information about stage override mode, read Testing settings and equipment on page 40.










