Instruction manual

12 | Cannon Fitzroy / Canterbury Inbuilt
FITZROY & CANTERBURY INBUILT FLUEING
Transition rectangular to 100mm round.
(supplied as standard)
The flue must be fixed in place.
Ø100mm flue
Heater
Install heater
onto a solid,
leveled base.
Roof cladding
500mm between top of
cowl and nearest part of
roof. (Also refer to AS
5601)
Flue cowl
approved to
AG604
Flue clamp
Flashing
Fit two lengths of vertical flue (1.8m) before fitting
any 45° bends. If bends are used, fit inside of flue
pipe. Use no more than two 45° bends in the total
flue run and maintain at least 250mm of straight
flue pipe between the bends.
FIG 7 This diagram is a general guide only.
Please note: Flueing of heater MUST
be carried out by an authorised person.
Refer to Australian Standard Gas
Installations AS 5601.
Installing a ue on the shorter wall may
subject it to down draughts or reverse
air ows through the heater which can
be difcult to nd a solution to. Always
adopt correct ue design practices.
Refer to Australian Standard Gas
Installation AS 5601 for ‘location of
ue terminal’.
The heater has been tested and should
operate satisfactorily with an optimum
ue length of 4.5 meters.
Exceeding this length may affect the
stability of the ame pattern and the
operation of the heater. Contact our
technical support department if any
further advice is required.
Flue installation