Technical information

COPYRIGHT
©
2000 CANON INC. 2000 2000 2000 ColorPASS-Z40e/Z20e REV.0 AUG. 2000
CHAPTER 2 PREPARING FOR INSTALLATION
2-7
3 Unpacking the ColorPASS
The ColorPASS is assembled and shipped from the factory in a box that includes all nec-
essary cables and documentation, as shown in F02-301-01 on page 2-7.
3.1 To Unpack the ColorPASS
1. Open the ColorPASS Color Server box and remove the packing material.
Save the original boxes and packing materials. If you need to transport the ColorPASS
at a later date, the original box and packing material will ensure safe shipment.
2. Remove the contents from the top container. Inspect the contents for visible damage.
The top container should include the following items:
Bags containing a copier interface cable and an AC power cable.
Media package (includes a package of user documentation and software).
3. Give the media package to the customer or the network administrator.
Let the customer or network administrator know that in order to take full advantage of
the ColorPASS, the user software must be installed on computers that will print to the
ColorPASS.
4. Set aside the remaining components from the top container.
5. Remove the top container and any packing materials.
Set aside the packing material and note the orientation of the ColorPASS inside the ship-
ping container in case you need to repack it later.
6. Carefully lift the ColorPASS out of the box.