Product specifications

DC10 E, DC20 E
DISASSEMBLING
35
<Note on Reassembling>
(1) Attach the Open Knob and the Open Knob Spring as shown in the figure below.
(2) Attach the Lock Base Sheet to the position indicated in the figure below.
(3) Solder the SW FPC Ass'y to the Gear Motor and attach them as indicated in the figure below.
(4) Attach the Gap Sheet to the position indicated in the figure below.
Fig. 32
Note on Reassembling (1) Note on Reassembling (2)
Note on Reassembling (3)
Note on Reassembling (4)
D Cover Switch
Eject Switch
Dowel
Dowel
Dowels
Align with the dowels at two places.
Align with the dowels at two places.
Align with the dowels at two places.
Dowels
Mount the Open
Knob Spring.
While compressing the Open
Knob Spring, insert the Open
Knob sections A and B into
the slit of Lock Ass'y.
Insert
Bend the
flexible cable.
Solder
Solder
Lock Ass'y
Lock Ass'y
A
B
Open Knob
Lock Base Sheet
Lock Ass'y
Attachment
reference
Make them hit by
the standing sections.
AV Holder
Gap Sheet
Attach to the center
on the wall surface
of the AV Holder.