Service manual

Chapter 2
2-3
2.2 Unpacking and Installation
2.2.1 Unpacking and Removing the Packaging Materials
0011-1070
iR2016J / iR2016 / iR2020 / / iR2016i / iR2020i
1) Unpack the machine and remove vinyl, cushioning materials, and tape.
2) Hold the handles [1] of the machine together with one or more persons and
take it out.
The maximum weight of this machine is approximately 46kg. Two or more
persons are required to lift the machine.
F-2-5
2.2.2 Installing the Drum Unit
0011-1071
iR2016J / iR2016 / iR2020 / / iR2016i / iR2020i
1) Open the front cover [1] of the iR body.
F-2-6
2) Turn the developer pressure release lever [1] clockwise, and then open the
left door [2] until it stops.
The left door must be opened fully to prevent the drum from being damaged
while it is inserted into the drum unit.
F-2-7
3) Open the packaging bag of the new drum unit, take the new drum out of
it, and then remove packing tape.
The drum unit for Asia/Oceania is provided with pressure release hooks [1].
Remove them. Drum units for other regions are not provided with the pres-
sure release hooks.
F-2-8
4) Holding the protective cover [1] of the new drum unit, place the drum unit
against the iR body.
F-2-9
5) While holding the protective cover, insert the new drum unit [1] into the
iR body.
MEMO:
The protective cover will not be reused.
[1]
[1]
[1]
[2]
[1]
[1]
[1]