Product Brochure

- 23 -
G. Product: Endura®XL Grease Interceptor 100 GPM Grease Interceptor
as manufactured by Canplas Industries Ltd.
1. The unit shall be comprised of engineered thermoplastics to
withstand prolonged intermittent inuent discharge temperatures
up to 160 degree F (71 degree C) comprising of two load rated
covers capable of exceeding loads of 20,000 lb (9072 kg) and
incorporating an operationally air tight seal. The covers shall also
utilize four (4) mechanical fasteners to functionally secure and retain
the covers to the tank, but allow consistent removal and
replacement of the cover without operational compromise.
Functional elements such as baes will be made of material that
prevents corrosion or deterioration and shall be easily removable
for the purposes of maintenance, providing unrestricted upstream
and downstream drain access. The grease interceptor shall be
certied to the current version of the PDI-G101, ASME A112.14.3 or
CSA B481.1 and where locally applicable have UPC listing.
a. An integrated ow control device (Internal) with access to the
orice in service shall be provided with the interceptor.
b. An alternate ow control device (External) shall be supplied where
required by authority having jurisdiction. External ow control
device shall be accessible in operation; and when installed, the
internal ow control orice supplied as standard shall be
removed.
2. Model 40100A04 - Endura®XL 100GPM/200LB
(No-hub connection - Mechanical Joint coupling)
Model 40100A04T - Endura®XL 100GPM/200LB
(Threaded connection)
a. Flow Control (Internal)
b. Flow Control (External):
1) Model 40442100A (Hub Connection)
2) Model 40442100AT (Threaded connection)
c. Flow Rate: 100 US Gallons per Minute (6.3 L per second)
d. Minimum Grease Capacity: 200 lb (90.8 kg)
e. Grease Capacity Actual: 1058 lb (479.9 kg)
f. Average Eciency % (ASME 112.14.3 / NSF ES 15741): >98%
g. Unit Weight (Empty): 283 lb (128.3 kg)
h. Liquid Capacity: 257 gallons (972 L)
i. Connection size: 4 inches (102mm)
j. Trac Rated Cover: Designed to comply with AASHTO 304
minimum design load - 16,000 lb (7257 kg).
k. Cover Load Capability: Tested and third party approved based
on CSA Class ‘S’ (Special duty) requirements. Proof load
minimum 20,000 lb (9072 kg). To validate performance in
external applications testing shall include evaluation for
elevated and sub-zero temperatures.
l. Extension Risers: For use below grade; sized to project
requirements. Provide with 1 inch markers/ribs on riser
and anged bottom to interlock to frame. All installation
components to be supplied by the manufacturer (outlet
extension adaptors, seals and mechanical fasteners). Pipe
for handle extension by others.
1) Model 40100AX35 (Riser extension pair – long format)
a) 4”-35” per riser
2) Model 40100AX18 (Riser extension pair – short format)
a) 4” – 18” per riser
3. Model 40100A04M - Endura®XL 100GPM/200LB
(No-hub connection - Mechanical Joint coupling)
Model 40100A04MT - Endura®XL 100GPM/200LB
(Threaded connection)
a. Flow Control (Internal)
b. Flow Control (External):
1) Model 40442100A (Hub Connection)
2) Model 40442100AT (Threaded connection)
c. Flow Rate: 100 US Gallons per Minute (6.3 L per second)
d. Minimum Grease Capacity: 200 lb (90.8 kg)
e. Grease Capacity Actual: 1058 lb (479.9 kg)
f. Average Eciency % (ASME 112.14.3 / NSF ES 15741): >98%
g. Unit Weight (Empty): 283 lb (128.3 kg)
h. Liquid Capacity: 257 gallons (972 L)
i. Connection size: 4 inches (102mm)
j. Cover Load Capability: Tested and third party approved based
on CSA Class ‘M’ (Medium duty) requirements. Proof load
minimum 4000 lb (1814 kg). To validate performance in
external applications testing shall include evaluation for
elevated and sub-zero temperatures.
l. Extension Risers: For use below grade; sized to project
requirements. Provide with 1 inch markers/ribs on riser
and anged bottom to interlock to frame. All installation
components to be supplied by the manufacturer (outlet
extension adaptors, seals and mechanical fasteners). Pipe
for handle extension by others.
1) Model 40100AX35 (Riser extension pair – long format)
a) 4”-35” per riser
2) Model 40100AX18 (Riser extension pair – short format)
a) 4” – 18” per riser
2.4 SOLIDS INTERCEPTOR
H. Product: Endura® Solids Interceptor as manufactured by
Canplas Industries Ltd.
1. Parts in direct contact with ow shall be constructed of
engineered thermoplastic capable of withstanding
operational temperatures up to 220 degree F (104 degree C).
Baes shall be perforated with slots as opposed circular
perforations for enhanced straining of elongated debris e.g.
mop strings, spaghetti etc. The solids interceptor basket
component shall be removable for cleaning and in operation
have a minimum ow rate greater than 50 GPM (3.2 liter per
second) when loaded to 50% of its solids-holding capacity.
Any baes/straining method used shall also be removable for
maintenance and operation shall use a dual means of
ltration on solid material within the ow. When installed in a
stand-alone conguration the tank will meet the same
specication as above and have both a lid which is airtight
and capable of supporting 440 lb (200 kg).
2. Model 3911A02: Solids Interceptor. Complete with Solids
Basket Accessory (SBA):
a. Flow Rate: <50 GPM.
b. Average Eciency % (Internal Testing Only): 98%.
c. Unit Weight (Empty): 19.4 lb (8.18 kg)
d. Liquid Capacity: 12.96 gal (49.06 L).
e. Connection size: 2 inches (51 mm) - (No-hub
connection - Mechanical Joint coupling)
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been properly
prepared.
B. If substrate preparation is the responsibility of another
installer, notify Architect of unsatisfactory preparation before
proceeding.
3.2 PREPARATION
A Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the
manufacturer for achieving the best result for the substrate
under the project conditions.
3.3 INSTALLATION
A. Install in accordance with manufacturer’s instructions.
B. Do not pressurize any interceptor as there is a serious risk
of injury and death. The interceptor as an appurtenance
shall be isolated for the purposes of leak testing the upstream
and downstream drainage system when commissioning and
verifying the system operation.
C. Interceptor tank will be installed to the associated drainage
system using mechanical joint couplings approved by the
Authority Having Jurisdiction (AHJ). Supplied by others.
D. When installing in-oor tanks will be lled to static water
level with water to prevent movement and resist pressure of
backlling process.
E. Cover will be secured in place during backlling process to
maintain structural rigidity and form and to prevent ingress of
foreign bodies into both the interceptor and drainage system.
3.4 FIELD QUALITY CONTROL
A. Provide inspection certicates of Authority Having
Jurisdiction (AHJ).
3.5 PROTECTION
A. Protect installed products until completion of project.
B. Touch-up, repair or replace damaged products before
Substantial Completion.
END OF SECTION