Brochure

- 16 -
• Suspended
• Suspended - Extended Capacity
Due to the degree of risk and potential liability for
the installer, great care must be taken in designing
a hanger system. Canplas recommends consulting
an engineer before installing in this manner.
Due to the degree of risk and potential liability for
the installer, great care must be taken in designing
a hanger system. Canplas recommends consulting
an engineer before installing in this manner.
Hanger must accommodate min.
541 lb (246kg) Safety factor of 2.5
is recommended.
When full the weight of the tank is
signicant XL75 Approx. 1300lb [590kg],
XL100 Approx. 2150lb [975kg]
Safety factor of 2.5 is recommended.
For suspended application engineering service
by a qualied engineer will be necessary.
• Flow Control Device
• Flow Control Device
Vented Waste
Vented Waste
• Grease Interceptor
• Grease Interceptor
• Air Intake
• Air Intake
• Air Intake
• Sink
• Sink
• Sink
• Hanger (Supplied by installer,
designed by licensed engineer)
• Hanger (Supplied by installer)
• Hanger (Supplier by installer)
• Concrete pit
• Load Rated Access Cover
(supplied by others)
• In Floor Alternate
• Fork Lift, Pump Truck Trac Area
Provision of a concrete pit with a load rated
access cover will be required where pump
trucks of fork lifts travel.
Note: XL Extended Capacity Models
EnduraXL models are manufactured with Load
Rated covers. See page 17 for installation notes.
Do Not Exceed 25 ft (7.6 m)
Do Not Exceed 25 ft (7.6 m)
Do Not Exceed 25 ft (7.6 m)
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
• XL Grease Interceptor
• External Flow Control
required for PDI installations
• Internal Flow Control
and Bae
* Above grade installation preferred
*
• Cleanout required in
most jurisdictions
• Cleanout required in
most jurisdictions
• Cleanout required in
most jurisdictions