- 22 -
on riser, anged bottom to interlock and secure to
frame. Handle and outlet extensions, seals and
fasteners to be supplied by manufacturer.
G. Product: Grease Interceptor (Extended Capacity)
100 GPM as manufactured by Canplas Industries Ltd.
1. The unit shall be comprised of engineered
thermoplastics to withstand operational temperatures
up to 160˚F (71˚C) comprising of two
load rated covers capable of supporting min. 20,000 lb
(9072 kg) and incorporating an operationally air
tight seal. The covers shall utilize 4 bolts to
functionally secure and retain the covers to the tank,
but allow consistent removal and replacement
of the cover without operational compromise.
Functional elements such as baes will be made of
material that prevents corrosion or deterioration and
shall be removable for the purposes of replacement,
providing unrestricted upstream and downstream
drain access. The grease interceptor shall be certied to
the current version of the PDI-G101, ASME A112.14.3 or
CSA B481.1 and where locally applicable have UPC
listing.
2.
Model 40100A04 - 100GPM/200 lb (Hub Connection)
Model 40100A04T- 100GPM/200 lb (Threaded Connection)
a. Connection size (mechanical): 4” (Sch40DWV) (110mm).
b. Flow Control Model:
- Hub Connection: 40442100
- Threaded Connection: 40442100AT
c. Flow Rate: 100GPM (6.3 L/Sec).
d. Min. Grease Capacity: 200 lb (90.8 kg).
e. Average Eciency % (ASME 112.14.3): 99%.
f. Actual Grease Capacity: 1058 lb (479.9 kg).
g. Unit Weight (Empty): 283 lb (128.3 kg).
h. Liquid Capacity: 257 gallons (972 L).
i. Cover Design Load (Trac Rated): Exceeds 16,000 lb
(7257 kg) (AASHTO 304-H20)
j. Cover Load Capacity (Trac Rated): CSA ‘S’ Rating,
Special Duty: Exceeds 20,000 lb (9072 kg), -20˚F to
+100˚F (-29˚C to +38˚C)
k. Internal Flow Control Device:
Internal ow control device with integrated air intake
and tool-less access to the orice in service shall be
provided with the interceptor.
l. External Flow Control Device (optional For PDI
Installations as required):
External ow control device
PN: 40442100AS (Hub Connection) or
PN: 40442100AT (Threaded Connection) with
air intake and access to the orice
in service shall be supplied with the interceptor.
m. Extension Risers: For use below grade; sized to project
requirements on site. Provide with 1” markers/ribs
on riser, anged bottom to interlock and secure to frame.
Handle and outlet extensions, seals and fasteners to be
supplied by manufacturer.
2.4 SOLIDS INTERCEPTOR
A. Product: Solids Interceptor as manufactured by
Canplas Industries Ltd.
1. Parts in direct contact with ow shall be constructed of
engineered thermoplastic capable of withstanding
operational temperatures of 220˚F (104˚C).
Baes shall be perforated with slots as opposed
circular perforations for enhanced straining
of elongated debris e.g. mop strings, spaghetti etc.
The solids interceptor shall be removable for cleaning
and in operation have a minimum ow rate greater
than 50GPM (3.2 L/Sec) when loaded to 50%
of its solids-holding capacity. Any baes/straining
method used shall also be removable for maintenance
and operation shall use a dual means of ltration on
solid material within the ow. When installed in a stand-
alone conguration the tank will meet the same
specication as above and have both a lid which is
airtight and capable of supporting 440 lb (220 kg).
2. Type: Stand Alone Model 3911A02: Solids Interceptor.
Complete with Solids Basket Accessory (SBA): 2”
(51 mm) inlet.
3. Type: Integral to Interceptor Model 3911A-1: Solids Basket
Accessory (SBA).
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been
properly prepared.
B. If substrate preparation is the responsibility of another
installer, notify Architect of unsatisfactory preparation
before proceeding.
3.2 PREPARATION
A. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by
the manufacturer for achieving the best result for the
substrate under the project conditions.
3.3 INSTALLATION
A. Install in accordance with manufacturer’s instructions.
B. Do not pressurize any interceptor as there is a serious
risk of injury and death. The interceptor as an
appurtenance shall be isolated for the purposes of leak
testing the upstream and downstream drainage system
when commissioning and verifying the system
operation.
C. Interceptor tank will be installed to the associated
drainage system using mechanical joint couplings
approved by the Authority Having Jurisdiction (AHJ).
Supplied by others.
D. When installing in-oor, tanks will be lled to static
water level with water to prevent movement and resist
pressure of backlling process.
E. Cover will be secured in place during backlling
process to maintain structural rigidity and form and to
prevent ingress of foreign bodies into both the
interceptor and drainage system.
3.4 FIELD QUALITY CONTROL
A. Provide inspection certicates of Authority Having
Jurisdiction (AHJ).
3.5 PROTECTION
A. Protect installed products until completion of project.
B. Touch-up, repair or replace damaged products before
Substantial Completion.
END OF SECTION