Assembly Manual

Leae the cables hanging don at this point; all
cables ill be routed and secured in the folloing
assembl section.
The Y1 motor is mounted to the Left Y-Ais
Carriage (hen ieed from front). Connect the
ires as shon in the image belo.
Route the ires/cables through the rst port on the
bottom (the hole closest to the rear of the
Shapeoko XXL) of the Controller Lid as shon in
the image belo.