Specifications
Installation & Maintenance Manual   
 12 
6. Install Steam Distributor Pipes 
If your SD 2000 humidifier was supplied with duct steam 
distributor pipes, they must be mounted completely level in the 
duct with the steam outlet holes facing up as shown to the 
right. Support the end of longer distributor pipes if needed. 
Distributor pipes should be mounted per the diagrams shown 
below, with a minimum of 6” from the center of the distributor 
pipe to the top of the duct and 3” minimum to the bottom. 
Generally the distributor 
pipes should be mounted in 
the center of the air stream. 
Multiple pipes need to be 
staggered on a diagonal to 
prevent the steam 
discharge from the lower 
pipes from impinging on the 
upper ones. 
In vertical ducts, the distributor pipes are mounted in the center 
with the holes facing up as shown at right. The airflow may be up 
or down, but when the airflow is down, maximum velocity is 
1,500 fpm. 
To install the distributor pipes: 
1. Cut a key shaped hole in the side of the duct to match the steam pipe and 
condensate return. 
2. Apply silicone sealant to the mounting plate and insert the pipe through the 
hole and secure it with 4 sheet metal screws. 
3. Connect the steam and condensate hoses using the hose clamps supplied. 
IMPORTANT: Allow 3 feet of straight duct downstream of the distributor 
pipes when the air temperature will be >55
o
F. Allow 6 feet of straight duct 
if the air temperature will be <50
o
F. Always allow 3 feet upstream. 










