Product Brochure

37
www.carlon.com
Remodeling: Run ENT in floors and walls with a
minimum disruption of existing building while
completing the job with minimum expense.
An outlet can be
added after the
wall is poured.
Channel the wall,
install ENT and the
box, furr out and
finish. Because ENT
is pliable, it will
follow the contour
of the channel.