Product Brochure

29
www.carlon.com
5.
WHAT IF I AM RUNNING ENT, THEN FIND I MUST
RUN THROUGH AN AIR-HANDLING SPACE?
You run the ENT to a point before entering the air-handling
plenum, change to metal conduit, run through the
air-handling space with the metal conduit, and change to
ENT for the balance of the run (see NEC Section 300.22
(A) through (D).
ENT above a suspended
ceiling for receptacle drops
ENT and Carlon boxes
roughed-in for fixture whips
ENT feed fixture roughed-in
ENT above a suspended ceiling
(ENT fixture whips)