2816K PERIMETER WORKSTATION ASSEMBLY INSTRUCTIONS
TABLE OF CONTENTS PAGE REVISIONS TABLE ASSEMBLY COMPONENTS BASE ASSEMBLY PERIMETER ASSEMBLY ISLAND ASSEMBLY WING ASSEMBLY APRON RAIL ASSEMBLY ROD SOCKET ASSEMBLY TOP ASSEMBLY BACKSPLASH ASSEMBLY SINK ASSEMBLY FIXTURE ASSEMBLY UTILITY ASSEMBLY CHASE ASSEMBLY MOULDING ASSEMBLY PULL ASSEMBLY …………………………………………………………………………………………………………………….…………………..……….…………..……….…………………………………………..…………………………… 3 3 4 4 5 5 5 6 7 7 7 8 8 8 9 9 …………………………………………………………………………………………………………………….…………………..……….……….…………….
ASSEMBLY COMPONENTS ITEMS INCLUDED 16 SHELF CLIPS PART # 100027 1-HARDWARE BOX PART # 20 FT RUBBER BASE 100283 2 FIXTURES,L65-WSA-DIV 100074 6 RAIL CLEATS 100355 1 EPOXY SINK,L3 100691 2 ELECTRICAL BOX 100033 1 EPOXY TOP 42x66 100723-A 2 GFI 100034 1 EPOXY TOP 18X90 100723-B 4 ROD SOCKET ASSY 206505 1 EPOXY TOP 4X90 100723-C 6 SS CORNERS 100057 4 ADJ SHELVES 14X22.19 24 SS #6x1/2 PTH SCREW 100064 2 FILLER PANELS 12X24.
Assembly Instructions for 2816K PERIMETER WORKSTATION Items not included but needed for assembly: 1. Screwdrivers and wrenches 2. Contact cement 3. Utility Knife 4. Tape measure 5. Clear silicone adhesive 6. Drill and 1/8” drill bit Instructions: 1. Find the two cabinets with cleats that run from top to bottom and place the two cabinets against the wall with the cleats facing each other. Cabinets should be placed 42” apart. 2.
4. Place remaining two units with 11” cleats (pointing towards the wall) back-to-back and secure 7” x 35” filler panels between the cabinets on each side using the #10 x 1-1/2” truss head screws. 5. Apply the steel rail cleats to the wing assembly (Figure 5A) and the (2) 24.25” x 4.5” rails (Figure 5B) with the #8 x ¾” truss head screws. Figure 5A Figure 5B 6. With one person holding the wing with rod storage, another person should attach it to the outside of the cabinets using #8 x ¾” truss head screws.
7. Attach the (2) 24.25” x 4.5” rails that goes between the back-to-back cabinets and the wall cabinets using the #8 x ¾” truss head screws. Again it is recommended that two people perform this task. 8. (If Applicable) Assemble the Rod Socket Assembly as shown in Figure 8A. (If Applicable) Attach Rod Sockets to Top as shown in Figure 8B.
9. Outline the top of the base unit with the silicone seal and place top on the unit. Make sure silicone is applied in between tops were one top butts against another. Be sure to center the top on the base unit before the silicone dries. Do not apply adhesive to filler panels shown below, doing so will prohibit access to utilities connections. 10. Clean the top with water only. Be sure the top is clean and dry before installing the backsplash.
12. Mount fixtures into place. 13. Remove the access panels to access the plumbing and gas. All water, electrical and gas connections should be performed by a trained professional. 14. Attach the 24.25” x 12” plumbing chases to cleats using #10 x 1-1/2” truss head screws.
15. Attach the rubber base molding using contact cement. After molding is in place, screw stainless steel corner brackets on each corner over the base molding. 16. Reverse the door pulls as shown below.