Specifications
Chapter 6 TR-08 Option
6-8
Switch 10: Not Used
EXAMPLE FRONT PANEL DIP SWITCH SETTINGS
Figure 7-7 below shows two example front panel DIP switch settings for reference.
ON
T1 line buildout set for -7.5dB, clock source is
slaved off of the T1 line, shelf B/C/D setting,
AMI line coding, CSU on, test tone off, and
BPV threshold set for 10
-6
1 2 3 4 5 6 7 8 9 10
ON
T1 line buildout set for -15dB, clock source is
slaved off of the T1 line, shelf A setting, B8ZS
line coding, CSU on, test tone off, and BPV
threshold set for 10
-5
1 2 3 4 5 6 7 8 9 10
Figure 7-7: Front Panel Bipolar Violation Settings for TR-08 Operation
The operation of the Self Test, Network Loopback, Remote and Alarm Cutoff (ACO) switches
remain unchanged from D4 or ESF operation.