Installation guide

48JZ(N) 024-060
Single Packaged Gas Heating/Electric Heat Pump
Umts With Puron® (R-410A) Refrlqerant
Visit www.camer.eom
Installation, Start-Up, and Operating Instructions
NOTE: Read the entire instruction manual before starting the
installation.
TABLE OF CONTENTS
SAFETY CONSIDERATIONS ..................................................... 1
INTRODUCTION .......................................................................... 2
RECEIVING AND INSTALLATION .......................................... 2
CHECK EQUIPMENT ............................................................. 2
IDENTIFY UNIT ................................................................ 2
INSPECT SHIPMENT ........................................................ 2
PROVIDE UNIT SUPPORT .................................................... 2
ROOF CURB ....................................................................... 2
SLAB MOUNT ................................................................... 2
GROUND MOUNT ............................................................ 2
FIELD FABRICATE DUCTWORK ........................................ 3
PROVIDE CLEARANCES ...................................................... 4
RIG AND PLACE UNIT ......................................................... 6
CONNECT CONDENSATE DRAIN ...................................... 6
INSTALL FLUE HOOD .......................................................... 6
INSTALL GAS PIPING ........................................................... 7
INSTALL DUCT CONNECTIONS ........................................ 9
CONFIGURING UNITS FOR DOWNFLOW (VERTI-
CAL) DISCHARGE ............................................................ 9
INSTALL ELECTRICAL CONNECTIONS ......................... I0
HIGH-VOLTAGE CONNECTIONS ................................ 10
SPECIAL PROCEDURES FOR 208-V OPERATION ...11
CONTROL VOLTAGE CONNECTIONS ....................... 11
HEAT ANTICIPATOR SETTING ................................... 11
TRANSFORMER PROTECTION .................................... 11
PRE-START-UP .......................................................................... 12
START-UP ................................................................................... 13
CHECK FOR REFRIGERANT LEAKS ............................... 13
START-UP HEAT AND MAKE ADJUSTMENTS ............. 13
CHECK HEATING CONTROL ....................................... 13
HEATING SEQUENCE OF OPERATION-HEAT
PUMP ................................................................................. 18
HEATING SEQUENCE OF OPERATION-GAS
HEAT ................................................................................. 18
START-UP COOLING AND MAKE ADJUSTMENTS....., 19
COOLING SEQUENCE OF OPERATION ..................... 19
CHECKING COOLING CONTROL OPERATION (NON-
ICM UNITS) ...................................................................... 19
MAINTENANCE ......................................................................... 20
AIR FILTER ...................................................................... 22
INDOOR BLOWER AND MOTOR ................................ 22
FLUE GAS PASSAGEWAYS ......................................... 24
COMBUSTION-AIR BLOWER ....................................... 24
LIMIT SWITCH ................................................................ 25
BURNER IGNITION ........................................................ 25
MAIN BURNERS ............................................................. 25
OUTDOOR COIL, INDOOR COIL, AND
CONDENSATE DRAIN ................................................... 25
OUTDOOR FAN ............................................................... 25
ELECTRICAL CONTROLS AND WIRING .................. 25
HEAT PUMP SYSTEM ITEMS ...................................... 26
REFRIGERANT CIRCUIT ............................................... 27
GAS INPUT ...................................................................... 27
INDOOR AIRFLOW ........................................................ 27
PURON® SYSTEM ITEMS ............................................ 27
TROUBLESHOOTING ............................................................... 28
START-UP CHECKLIST ............................................................ 28
NOTE TO INSTALLER-- Before the installation, READ THESE
INSTRUCTIONS CAREFULLY AND COMPLETELY. Also,
make sure the User's Manual and Replacement Guide are left with
the unit after installation. The furnace is NOT to be used for
temporary beating of buildings or structures under construction.
C99O88
Fig. 1--Untt 48JZ
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components, Only
trained and qualified personnel should install, repair, or service
alr-eooditioning equipment.
Untrained personnel can perform basic maintenance functions of
cleaning coils and filters. All other operations should be performed
by trained service personnel. When working on air-conditioning
equipment, observe precautions in the literature, tags, and labels
attached to the unit, and other safety precautions that may apply.
Follow all safety codes. Wear safety glasses and work gloves. Use
quenching cloth for unbrazing operations. Have fire extinguisher
available for all brazing operations.
Manufacturer reserves the right to discontinue, or change at any time, speciflcatiotls or designs without notice and without Incurring obligations.
PC 101 Catalog NO, 534--80083 Printed in U.S,A, Form 48JZ-1SI Pg 1 10-01 ReplaCeS: New

Summary of content (36 pages)