System information

5
Top view Rear view
Full louvre
Full louvre
Full louvre
Full louvre
Required clearances to combustible material
Top of unit 356 mm
Duct side of unit 50 mm
Side opposite ducts 356 mm
Bottom of unit 13 mm
Electric heat panel 914 mm
Required clearances for electrical system
Between units, power entry side 1067 mm
Unit and ungrounded surfaces, power entry side 914 mm
Unit and block or concrete walls and other grounded surfaces,
power entry side 1067 mm
Required clearances for operation and service
Evaporator coil access side 914 mm
Power entry side (except for electrical requirements) 914 mm
Unit top 914 mm
Side opposite ducts 914 mm
Duct panel 305 mm
* Minimum distances: If the unit is placed less than 305 mm from the wall, system
performance may be affected.
All dimensions are in millimetres.
45 dia. hole,
power entry
22 dia. hole,
control entry
Optional
return air
opening
Optional
supply air
opening
Supply
duct
opening
Return
duct
opening
Evaporator
Condenser
SupplyReturn
356
356
343
86
70
407
118
87
351
402
351
347
1091
1123
329
72
620
43
23
1194
1226
326
185
87
122
4
Compressor, fan, electric heat
and electrical access panel
Fig. 2 - Dimensions, 50JZ 048
50JZ Power supply Unit weight Unit height A Centre of gravity, mm
V-ph-Hz kg mm X Y Z
048 400-3-50 161 1041 508 540 457
Drain outlet 19
NPT x 22 deep
Field entry
sevice ports
Left-side view Front view Right-side view