System information

9
A
B
C
M
A
-
OPTIONAL
RETURN
AIR
OPENING
OPTIONAL
SUPPLY
AIR
OPENING
EVAP. COIL COND. COIL
2"
HANDHOLD
FEED
HOOK
Maximum allowable difference
A-B B-C A-C
6 mm 6 mm 6 mm
Fig. 5 - Unit levelling tolerances
Fig. 6 - Slab mounting detail
Evaporator
Condenser
Optional
return air
opening
Optional
supply air
opening
50
mm
Fig. 7 - Threading belt
Handhold
Feed
Hook
PLACE RIGGING BRACKET ASSEMBLY IN 4
RIGGING HOLES AND INSTALL TIE DOWN STRAP
INSTALL SAFETY STRAPS TO
RIGGING CLEVIS AT 4 RIGGING BRACKETS
TIGHTEN STRAPPING SECURELY
WITH TENSION BUCKLE
DETAIL A
SCALE 0.250
914-137"
(36"-54")
“A”
“B”
Fig. 8 - Suggested rigging
50JZ Max. weight, kg A (mm) B (mm)
024 146 483 464
030 155 508 489
036 159 508 483
048 171 508 540
914-1371 mm
See detail A Place rigging bracket assembly in four rigging holes and install tie-down
strap around perimeter of unit and through space in bracket assembly
Install safety straps to rigging clevis at four rigging brackets
Tighten strapping securely with tension buckle
Detail A