Installation guide

®
to the Expertg_
Installation, Start-Up, and Operating Instructions
for Sizes 040-140, Series 110 & 120
Visit www.Carrier.com
NOTE: Read the entire instruction manual before starting
the installation.
NOTE: This furnace can be installed as a (2-pipe) direct vent
or (1-pipe) non-direct vent condensing gas furnace.
ISO 9001:2000
@
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CSA
B149 code. Vent systems must be composed of pipe, fittings,
cements, and primers listed to ULC $636. The special vent
fittings and accessory concentric vent termination kits and
accessory external drain trap have been certified to ULC $636 for
use with those IPEX PVC vent components which have been
certified to this standard. In Canada, the primer and cement must
be of the same manufacturer as the vent system - IPEX System
636, PVC/CPVC Primer, Purple Violet for Flue Gas Venting and
IPEX System 636(1) TM, PVC Cement for Flue Gas Venting, rated
Class IIA, 65 deg C. must be used with this venting system - do
not mix primers and cements from one manufacturer with a vent
system from a different manufacturer. Follow the manufacturer's
instructions in the use of primer and cement and never use primer
or cement beyond its expiration date.
The safe operation, as defined by ULC $636, of the vent system
is based on following these installation instructions, the vent
system manufacturer's installation instructions, and proper use of
primer and cement. All fire stop and roof flashing used with this
system must be UL listed material. Acceptability under Canadian
standard CSA B149 is dependent upon full compliance with all
installation instructions. Under this standard, it is recommended
that the vent system be checked once a year by qualified service
personnel.
The authority having jurisdiction (gas inspection authority,
municipal building department, fire department, etc) should be
consulted before installation to determine the need to obtain a
permit.
(1) System 636 is a trademark of IPEX Inc.
Consignes sp_ciales pour l'installation de ventillation au Canada
Uinstallation faite au Canada doit se conformer aux exigences du
code CSA B149. Ce syst_me de ventillation doit se composer de
tuyaux, raccords, ciments et appr_ts conformes au ULC $636. La
tuyauterie de ventillation des gaz, ses accessoires, le terminal
concentrique mural ainsi que l'ensemble du drain de condensat
ext_rieur ont _t_ certifies ULCS 636 pour l'application des
composantes IPEX PVC qui sont certifi_es fi ce standard. Au
Canada l'appr_t et le ciment doivent _tre du m_me manufacturier
que le syst_me de ventillation - IPEX Syst_me 636, Appr_t
PVC/CPVC. Mauve Violette pour conduit en _vacuation des gaz
et IPEX Syst_me 636(1) TM, ciment pour PVC pour conduit en
_vacuation des gaz, _valu_ CLASSE IIA, 65 deg. C. doit _tre
utilis_ avec ce syst_eme d'_vacuation - ne pas m_langer l'appr_t
et le ciment d'un manufacturier avec le syst_me de ventillation
d'un autre manufacturier. Bien suivre les indications du
manufacturier lors de l'utilisation de l'appr_t et du ciment et ne
pas utiliser ceux-ci si la date d'expiration est atteinte.
Uop_ration s_curitaire, tel que d_finit par ULC $636, du syst_me
de ventilation est bass sur les instructions d'installation suivantes,
ainsi que l'usage appropri_ de l'appr_t et ciment. Tout arr_t feu et
solin de toit utilis_s avec ce syst_me doivent _tre des mat_riaux
list,s UL. Uacceptation du standard Canadien CSA B419 est
directement reli_ fi l'installation conforme aux instructions ci-
haut mentionn_es. Le standard Canadien recommande 1'
inspection par un personel qualifi_ et ce, une fois par annie.
Les autorit_es ayant juridiction (inspecteurs de gas, inspecteurs
en bfitiments, d@artement des incendies, etc) devraient _tre
consult_es avant l'installation afin de d_terminer si un permis est
requis.