Installation manual

High Wall Type
Installation Manual
–24–
EN
11 Test Run
In case of wired remote control
Before test run
Before turning on the circuit breaker, carry out
the following procedure.
1) By using 500V-megger, check that resistance
of 1MΩ or more exists between the terminal
block L
1 to L2 and the ground (grounding).
If resistance of less than 1MΩ is detected, do
not run the unit.
2) Check the valve of the outdoor unit being
opened fully.
To protect the compressor at activation time,
leave power-ON for 12 hours or more be for
operating.
Before starting a test run, be sure to set
addresses following the Installation Manual
supplied with the outdoor unit.
Execute a test run
Operate the unit with the remote control as usual.
For the procedure of the operation, refer to the
attached Owner’s Manual.
A forced test run can be executed in the following
procedure even if the operation stops by thermo.-
OFF.
In order to prevent a serial operation, the forced test
run is released after 60 minutes have passed and
returns to the usual operation.
CAUTION
Do not use the forced test run for cases other
than the test run because it applies an
excessive load to the devices.
Wired remote control
Procedure 1
Push button for 4 seconds or more. [TEST] is
displayed on the display part and the selection of
mode in the test mode is permitted.
Procedure 2
Push button.
Procedure 3
Select the operation mode with button,
[COOL] or [HEAT].
Do not run the air conditioner in a mode other
than [COOL] or [HEAT].
The temperature controlling function does not
work during test run.
The detection of error is performed as usual.
Procedure 4
After the test run, push button to stop a
test run.
(Display part is same as procedure 1.)
Procedure 5
Push check button to cancel (release from) the
test run mode.
([TEST] disappears on the display and the status
returns to a normal.)
2, 4
3
1,5
24-EN