Owner's Manual
Table Of Contents
OnGuard v1.1 Integration Carrier Proprietary and Confidential ©2022 Carrier.
for v8.0 or later systems All rights reserved.
9
Advanced Occupancy Scheduling is an add-on that predicts and schedules occupancy based on past occupancy
data. The schedule that is generated contains no undefined regions and the whole day is scheduled with off and
on times. For example, a 9-5 schedule would be written with midnight to 9am as off, 9am-5pm as on and 5pm to
midnight as off.
The Occupancy Schedule Optimizer algorithm provided with the algorithm schedules optimal building area
operational schedules based on actual building usage patterns. This add-on compares security card logs to
occupancy count information in user-defined areas and then schedules equipment based on the average time the
area reaches a user-defined occupancy threshold.
The add-on functions by associating data by day of the week and maintaining rolling data sets of the last five
occurrences. For example, the add-on schedules equipment on Monday based upon the usage patterns of the five
most recent Mondays. This allows the algorithm to accommodate variations of occupancy among the different
days of the week and adapt over time as usage patterns change.
The Occupancy Percentage parameter allows the user to define when the building is considered occupied for the
purposes of scheduling using a percentage value. For example, for an area with full occupancy of 100 people,
setting the parameter to 5% results equipment being scheduled ON when the algorithm predicts five or more
occupants will be present. Increasing the parameter conserves energy by allowing a larger occupancy count to be
considered unoccupied, with the converse true for reducing it.
Finally, the Occupancy Schedule Optimizer algorithm conducts continuous data quality checks to ensure that
irregular occupancy events, such as holidays, do not impact the scheduling function. Any data that deviates
significantly from the rolling data set is discarded when predicting schedules.
Setting scheduling properties of a zone
TIP For the scheduling properties described below, you must have either the Start Time or Stop Time set to
Predicted before you can configure Algorithm or Occupancy Percent.
1 On the
Scheduling tab, click on the zone you wish to configure in the Zone list.
2 Click on
Config in the Schedules panel.
3 Set both the
Start Time and Stop Time to either Predicted or Fixed; if Fixed, select a time.
NOTE If Predicted, select an algorithm and a percent for occupancy.
4 Select an
Algorithm from the droplist to use for the occupancy prediction.
5 Adjust the
Occupancy Percent setting to modify how the selected algorithm predicts the start and stop time.
NOTE Use the Reset All Occupancy Data button ( ) on the Zone panel to remove all data
used by the occupancy schedule algorithm. The add-on must re-accumulate this data before the algorithm can
make schedule predictions. Use this option after an extended period of unusual occupancy activity. For example,
when a building has just come out of commissioning and is ready to start recording real occupancy data.
Setting up the Advanced Occupancy Scheduling add-on










