TITAN 250 Turbomachinery Package Specification Oil & Gas and Power Generation Applications Generator Set
TURBOMACHINERY PACKAGE SPECIFICATION TitanTM 250 Generator Set Solar Turbines Incorporated P.O. Box 85376 San Diego, CA 92186-5376 Caterpillar is a trademark of Caterpillar Inc. Solar, Titan, SoLoNOx, and Turbotronic are trademarks of Solar Turbines Incorporated. All other trademarks, service marks, or registered trademarks appearing in this specification are the intellectual property of their respective companies. Specifications are subject to change without notice.
Turbomachinery Package Specification Titan 250 Generator Set Table of Contents 1 2 3 4 5 6 7 8 9 10 11 12 13 14 INTRODUCTION........................................................................................................................5 1.1 General Description ..........................................................................................................5 1.2 Overview ..............................................................................................................
Turbomachinery Package Specification Titan 250 Generator Set 15 MARINIZATION .......................................................................................................................61 15.1 General Description ........................................................................................................61 16 QUALITY ASSURANCE AND TESTING ................................................................................63 16.1 Quality Assurance.........................................
Turbomachinery Package Specification Titan 250 Generator Set Table of Figures Figure 1. Figure 2. Figure 3. Figure 4. Figure 5. Figure 6. Figure 7. Figure 8. Figure 9. Figure 10. Figure 11. Figure 12. Figure 13. Figure 14. Figure 15. Figure 16. Figure 17. Figure 18. Figure 19. Figure 20. Figure 21. Figure 22. Figure 23. Figure 24. Figure 25. Figure 26. Figure 27. Figure 28. Figure 29. Figure 30. Typical Titan 250 Gas Turbine Generator Set.............................................................
Turbomachinery Package Specification 1 Introduction 1.1 General Description Titan 250 Generator Set Solar Turbines Incorporated is a worldwide leader in the design, manufacture, and installation of industrial gas turbines. Solar's 40 years of experience integrating high technology with fluid compression, liquid pumping, power generation, and cogeneration applications has resulted in more than 12,500 gas turbine installations in 92 countries around the world.
Turbomachinery Package Specification Titan 250 Generator Set 2 Titan 250 Gas Turbine Generator Set 2.1 General Description The Titan 250 gas turbine generator set (Figure 1) is a completely integrated and fully operational package equipped with all accessories and auxiliary systems required for operation. In addition to the standard package features, a wide array of optional equipment is available to meet the customer’s installation and operation requirements.
Turbomachinery Package Specification • • • • • • • • • 2.3.
Turbomachinery Package Specification Titan 250 Generator Set Figure 2. Typical Titan 250 Generator Set Service Connections (Driver Skid) Table 1.
Turbomachinery Package Specification Titan 250 Generator Set Construction Materials Piping, Manifolds, and Tubing < 10.2 cm (4 in.) Note (a) Piping, Manifolds, and Tubing > 10.2 cm (4 in.
Turbomachinery Package Specification 3 Titan 250 Gas Turbine 3.1 General Description Titan 250 Generator Set The two-shaft Titan 250 gas turbine (Figure 3) is a completely integrated and selfcontained prime mover. The Titan 250 gas turbine combines high performance operation with rugged industrial construction. This design philosophy allows for high efficiency, low maintenance, and a long service life.
Turbomachinery Package Specification Titan 250 Generator Set For combustion, the gas turbine requires approximately one-fourth of the total air it compresses. The excess air is mixed with the combustion products to reduce the gas temperature at the turbine first stage-inlet. The cooling air also keeps metal temperatures in the combustor and turbine assembly relatively low to ensure a long service life. Figure 4. Typical Combustion Process 3.1.
Turbomachinery Package Specification Titan 250 Generator Set Construction Materials Compressor Case - Forward Section Nodular Iron - Aft Section WC6 Alloy Steel Combustor Case 410 Stainless Steel Exhaust Diffuser Nodular Iron Accessory Gear Housing Ductile Iron Protective Coatings Compressor Rotor and Stator Blades Inorganic Aluminum Nozzles, First and Second Stage Precious Metal Diffusion Aluminide Blades, First and Second Stage Precious Metal Diffusion Aluminide Approximate Weight Gas Turbine Assembly 1
Turbomachinery Package Specification Titan 250 Generator Set 4 Reduction-Drive Gearbox 4.1 General Description The reduction-drive gearbox (Figure 5) is an industrial, epicyclic, star-gear design selected specifically for generator set applications. The gearbox uses few moving parts, which provides high reliability and ease of assembly and disassembly.
Turbomachinery Package Specification Titan 250 Generator Set 5 Generator and Associated Equipment 5.1 General Description For maximum flexibility, the gas turbine package can be provided with several different generator types and voltage outputs to accommodate a broad range of application requirements. The generator, exciter, and control system are integrated to provide optimal performance. The standard generator type supplied is open drip-proof (ODP) (Figure 6).
Turbomachinery Package Specification Titan 250 Generator Set Any variations in bus potential will also be sensed and corrected by this circuit. After voltage builds, the generator accelerates to 100% speed and excitation and voltage control is assumed by the CGCM. A crosscurrent-compensating transformer provides the signal to the CGCM for reactive loadsharing between multiple paralleled units. It should be noted that the generator rotor windings rotate and the generator armature is stationary.
Turbomachinery Package Specification Titan 250 Generator Set armature and a three-phase, full-wave, diode-type bridge rectifier that rotates with the armature. The pilot exciter is a PMG that rotates with the main generator rotor shaft. It feeds the exciter field windings with excitation current and is controlled by the CGCM. 5.2.7 Bearing Lubrication System The generator is supplied with a force-fed bearing lubrication system consisting of onskid piping and a filter strainer.
Turbomachinery Package Specification 6 Start System 6.1 General Description Titan 250 Generator Set The start system includes a direct-drive AC starter motor driven by a solid-state variable frequency drive (VFD). The start system provides torque to initiate engine rotation and to assist the engine in reaching a self-sustaining speed. The starter motor is mounted directly on the gas turbine accessory drive gearbox.
Turbomachinery Package Specification 6.2.2 Titan 250 Generator Set Variable Frequency Drive The VFD (Figure 7) is a motor speed controller that provides pulse-width modulated power with variable frequency and voltage to the starter motor. Controlled by the Turbotronic 4 control system, the VFD regulates voltage and frequency to the starter motor to control engine speed from standstill to starter dropout speed.
Turbomachinery Package Specification Table 4.
Turbomachinery Package Specification Titan 250 Generator Set Applicable Engineering Specifications Solar’s Engineering Specification ES 1593 Guidelines for NEC Compliance of Solar Product Lines: Class I, Group D, Division 1 and Division 2 Standards and Practices for Electrical Systems For Gas Turbine Packages Installed in Hazardous Areas (CENELEC Standards) Solar’s Engineering Specification ES 1762 Applicable Product Information Letters Solar’s Product Information Letter PIL 149 Direct-drive AC Start S
Turbomachinery Package Specification Titan 250 Generator Set 7 Fuel System 7.1 General Description The fuel system (Figure 10), in conjunction with the control system, includes all necessary components to control ignition and fuel flow during all modes of operation.
Turbomachinery Package Specification Titan 250 Generator Set • Fuel pilot control valve • Fuel pilot manifold • Inlet gas filter/coalescer loose shipped for field installation Component Operation The gas fuel pressure supplied to the turbine skid must meet minimum and maximum pressure and flow requirements. If the gas fuel pressure is too high or too low, the control system will prevent turbine operation.
Turbomachinery Package Specification Titan 250 Generator Set Customer-Furnished Pilot Air System Fluid Air Quality Minimum/Maximum Regulated Pressure Range Pilot Air Filter Construction Materials Piping, Manifolds, and Tubing Applicable Engineering Specifications Solar’s Engineering Specification ES 9-98 Clean-Dry Air See Note (d) 689 to 1379 kPag (100 to 200 psig) 10 micron 316L Stainless Steel Fuel, Air, and Water (or Steam) for Solar Gas Turbine Engines Guidelines for NEC Compliance of Solar Product L
Turbomachinery Package Specification 8 Lubrication System 8.1 General Description Titan 250 Generator Set The lubrication system, (Figure 11) circulates oil under pressure to the gas turbine and driven equipment. Lube oil is supplied from the lube oil tank located in the driver frame. Oil temperature is maintained at optimal levels by a thermostatic control valve, oil tank heater, and optional oil cooler.
Turbomachinery Package Specification Titan 250 Generator Set fire, control system failure, emergency stop, or if a turbine over-speed is detected by the backup system. 8.1.5 Duplex Lube Oil Filter System The duplex lube oil filter system is supplied with a filter transfer valve and filter differential pressure indication with alarm. The transfer valve allows a filter transfer to be performed while the gas turbine is running. The lube oil filter system is contained completely within the skid.
Turbomachinery Package Specification Titan 250 Generator Set Figure 11. Typical Lube Oil System 8.1.7 Lube Oil Vent Flame Arrestor The lube oil vent flame arrestor prevents an ignition source from entering the lube oil tank. The flame arrestor is loose shipped for offskid installation by others. 8.1.8 Lube Oil System Options Lube Oil Cooler An air-to-oil type cooler is available to provide oil cooling for the gas turbine and the driven equipment.
Turbomachinery Package Specification Titan 250 Generator Set 4.67 nm3/min.
Turbomachinery Package Specification Titan 250 Generator Set Applicable Engineering Specifications Solar’s Engineering Specification ES 9-224 Fuel, Air, and Water (or Steam) for Solar Gas Turbine Engines Guidelines for NEC Compliance of Solar Product Lines: Class I, Group D, Division 1 and Division 2 Standards and Practices for Electrical Systems for Gas Turbine Packages Installed In Hazardous Areas (CENELEC/IEC Standards – European ATEX Directive 94/9/EC) Solar’s Engineering Specification ES 1593 Solar
Turbomachinery Package Specification Titan 250 Generator Set 9 Turbotronic 4 Control System 9.1 Overview The Turbotronic 4 control system controls and monitors the turbomachinery package including the gas turbine and driven equipment. The system scope can be expanded to include monitoring and/or control of balance of plant equipment that is directly package related.
Turbomachinery Package Specification Titan 250 Generator Set AUXILIARY CONSOLE y METERING PANEL y TURBINE CONTROL PANEL y TT4000 PACKAGE SKID y TT4000S y OPERATOR PANEL REMOTE DESKTOP COMPUTER CONTROLNET ETHERNET y TT4000 y y y y y y CONTROL PROCESSOR I/O MODULES BACKUP SHUTDOWN SYSTEM FIRE & GAS SYSTEM VIBRATION MONITOR GENERATOR CONTROL MODULE AUXILIARY DESKTOP COMPUTER y TT4000 Figure 12.
Turbomachinery Package Specification Titan 250 Generator Set SAFE AREA OPERATOR INTERFACE MOTOR CONTROL CENTER TT4000 VARIABLE FREQUENCY DRIVES TURBINE CONTROL PANEL PRIMARY CONTROL SYSTEM COMPONENTS ONSKID OPERATOR INTERFACE SERIAL LINK TO SUPERVISORY CONTROL CONTROLLOGIX CONTROLLER TT4000S CONTROLNET OPERATOR PANEL I/O MODULES BACKUP SHUTDOWN SYSTEM FIRE & GAS SYSTEM VIBRATION MONITOR GENERATOR CONTROL MODULE CONNECTIONS TO PACKAGE AND FIELD INSTRUMENTATION Figure 14.
Turbomachinery Package Specification 9.3.4 Titan 250 Generator Set Vibration Monitoring System The system uses 1701 FieldMonitors and associated sensing devices from Bently Nevada. The capacity of each monitor is eight vibration channels plus a keyphasor input. The system is configurable from the control processor. It detects preprogrammed alarm and shutdown levels. See the specification tables for a list of monitored channels. 9.3.
Turbomachinery Package Specification Titan 250 Generator Set The fuel control valve gradually opens and admits fuel into the combustor through the injectors. The inlet guide vanes open and the bleed valve gradually closes. Fuel flow, engine temperature, and turbine speed all increase. Once starter dropout speed is exceeded, the starter freewheels and is de-energized. The engine continues to accelerate under its own power. The generator is loaded by closing the generator circuit breaker.
Turbomachinery Package Specification Titan 250 Generator Set a post-lube cycle to protect the gas turbine and driven equipment bearings from thermal damage. If the shutdown is the result of fire being detected, the turbine is brought to a complete stop and the start of the post lube cycle is delayed for 10 minutes, unless an operator intervenes. 9.4.
Turbomachinery Package Specification Titan 250 Generator Set Figure 15. Typical TT4000 Operation Summary Display Screen Figure 16. Typical TT4000 Strip Chart Display © 2008 Solar Turbines Incorporated. All rights reserved.
Turbomachinery Package Specification Titan 250 Generator Set Figure 17. Typical TT4000S Engine Summary Screen Figure 18. Typical TT4000S Generator Summary Screen 9.5.2 TT4000S Display Screens The TT4000S displays a comparable set of screens to the full TT4000 except that the data are in numerical form and graphics are limited (Figures 17 and 18). 9.5.
Turbomachinery Package Specification Titan 250 Generator Set Minute Log - data are read and stored at one-minute intervals for the previous 62 days, one file for each day. 10 Second Log - data are read at 10-second intervals for the previous 31 days, one file for each day. Trigger Log - data are read at one-second intervals for 6 minutes before a “trigger” event that is defined in the software. The standard trigger is a shutdown. Six minutes before the trigger of data are written to a file.
Turbomachinery Package Specification Table 7. Titan 250 Generator Set Turbotronic 4 Control System Specifications Control System Components Control Processor Input/Output Modules Generator Control Allen-Bradley ControlLogix controller Allen-Bradley Flex I/O modules Allen-Bradley/Basler Electric Combination Generator Control Module Bently Nevada 1701 FieldMonitor ControlNet 1.
Turbomachinery Package Specification Titan 250 Generator Set Package End Devices Transmitters 4-20 mA Switches 0-24VDC Thermocouples Type N Resistance Temperature Devices (RTDs) 100 ohm Platinum Proximiters 3300XL Solar’s Applicable Engineering Specifications ES 9-56 Fusion Welding ES 1593 Guidelines for NEC Compliance of Solar Product Lines: Class I, Group D, Division 1 and Division 2 ES 2231 Standards and Practices for The Design and Installation of Cable Channels and TC Rated Cables Installed In Class
Turbomachinery Package Specification Titan 250 Generator Set 10 Generator Control and Monitoring 10.1 General Description For generator control and monitoring, the Turbotronic 4 control system incorporates a Rockwell Automation/Allen-Bradley combination generator control module (CGCM). The CGCM provides generator control, protection, and monitoring.
Turbomachinery Package Specification 10.2 Titan 250 Generator Set Generator Control 10.2.1 Functional Description The Turbotronic 4 control system working in conjunction with the generator’s excitation system provides control, monitoring, and protection of the generator and its output. The key components are: • • • • Permanent magnet generator (PMG) Rotating armature-type AC exciter Full-wave rectifier assembly CGCM Figure 19 provides a simplified layout of these components.
Turbomachinery Package Specification Titan 250 Generator Set During initial turbine generator acceleration, the excitation power is switched off. At approximately 80% speed, the PMG output is connected to the excitation power contacts and voltage begins to build. The CGCM then provides controlled exciter field current at a level to maintain the generator terminal voltage at a predetermined value established by the operator.
Turbomachinery Package Specification Titan 250 Generator Set large power source, protection against excessive kW load is provided by turbine T5 temperature control. 10.2.6 Generator Metering Panel (Optional) Mounted on the front of an optional control console, the generator metering panel (Figure 20) provides meters to monitor generator output and switches to manually adjust generator voltage and to synchronize the generator breaker to the bus.
Turbomachinery Package Specification Titan 250 Generator Set Figure 20. Typical Generator Metering Panel 10.2.7 Generator Vibration and Temperature Monitoring X and Y proximity probes are mounted in the generator exciter and driven-end bearings. These probes are monitored continuously by the control system. Alarm and shutdown levels are set to protect the generator from excessive vibration levels Resistance temperature devices (RTDs) are mounted in the generator exciter and driven end bearings.
Turbomachinery Package Specification 11 Enclosure 11.1 General Description Titan 250 Generator Set A driver-only or complete package enclosure can be provided as required. The enclosure housing (Figure 21) is a completely self-contained, weatherproof, insulated, and soundattenuated system. The enclosure is mounted on the package skid and supported by a heavy-duty frame.
Turbomachinery Package Specification 11.2 Titan 250 Generator Set Standard Features 11.2.1 Inlet and Exhaust Ventilation Silencers The enclosure ventilation openings are equipped with silencers with weather louvers. 11.2.2 Single-Fan Ventilation A single high efficiency motor-driven fan provides enclosure ventilation. The ventilation fan provides airflow to ensure the enclosure internal air temperature remains within acceptable limits.
Turbomachinery Package Specification Titan 250 Generator Set an AC source independent from the package power system. This independent power source is not provided by Solar. 11.3.3 Dust Protection System The enclosure ventilation inlets are equipped with a single-stage, disposable, barrier-type filter unit equipped with a differential pressure alarm switch. The ventilation exhaust openings are equipped with back-draft dampers to prevent the entry of dust when the unit is not running. 11.3.
Turbomachinery Package Specification Titan 250 Generator Set The enclosure is also equipped with two gas detectors: one at the gas turbine enclosure ventilation air inlet and the other at the ventilation exhaust to provide continuous monitoring of combustible gases. The detectors consist of IR hydrocarbon sensors that provide input to the logical operating network (LON) module.
Turbomachinery Package Specification Titan 250 Generator Set On detection of a fire by the optional fire and gas detection system, the fire control panel activates the fire suppression system release solenoids located on the water mist suppression skid. On receipt of this signal, the solenoid actuated control heads activate the discharge valves on the water cylinders, releasing a water mist into the enclosure.
Turbomachinery Package Specification Table 9.
Turbomachinery Package Specification Titan 250 Generator Set Solar’s Applicable Engineering Specifications ES 1593 Guidelines for NEC Compliance of Solar Product Lines: Class I, Group D, Division 1 and Division 2 ES 1762 Standards and Practices for Electrical Systems for Gas Turbine Packages Installed In Hazardous Areas (CENELEC/IEC Standards – European ATEX Directive 94/9/EC) Solar’s Applicable Product Information Letters PIL 054 OSHA Noise Requirements PIL 058 Package Sound Levels PIL 150 Fire and Gas D
Turbomachinery Package Specification 12 Air Inlet System 12.1 General Description Titan 250 Generator Set The gas turbine combustion process requires a steady and consistent flow of clean air. Proper gas turbine inlet air filtration is critical to gas turbine life. Careful consideration should be given to selecting the appropriate air filtration system. Solar offers several air filtration systems that conform to a broad range of operating requirements.
Turbomachinery Package Specification Titan 250 Generator Set 12.1.2 Insect Screens Optional insect screens can be installed on each side of the air inlet filters (except for self-cleaning filters). This option is used with the air filter when large numbers of insects are present. The insect screen design reduces the velocity of the air stream sufficiently to allow most insects to fly away. Use of the screen helps to avoid clogging and premature filter replacement.
Turbomachinery Package Specification Titan 250 Generator Set Table 10.
Turbomachinery Package Specification 13 Exhaust System 13.1 General Description Titan 250 Generator Set The exhaust system (Figure 25) typically consists of all components installed downstream of the engine exhaust bellows expansion joint, including silencers and ducting, that are necessary to ensure a smooth flow of exhaust gas from the engine. The exhaust duct system must be terminated in a manner that precludes recirculation of exhaust products through the engine air inlet or oil cooler.
Turbomachinery Package Specification Titan 250 Generator Set Table 11. Exhaust System Specifications Exhaust System Temperature Class Total System Pressure Loss Exhaust Temperature Nominal System Back Pressure Construction Materials Exhaust Silencers Exhaust Ducting Exhaust Bellows Expansion Joint T2 Should Not Exceed 152 mm (6 In.) of Water 465°C (865°F) 203 mm (8 in.
Turbomachinery Package Specification Titan 250 Generator Set 14 Accessory Equipment 14.1 DC Power Supply and Battery Charger System This system provides 120 VDC power for the following devices: • The electric actuators that drive the fuel valves, bleed valve and variable guide vanes. • The 120 to 24 volt DC-to-DC converter in the control system that provides the 24 VDC control power. • The DC backup lube oil pump and DC back-up engine turning gear motors.
Turbomachinery Package Specification Titan 250 Generator Set Figure 27. Turbine Cleaning System 14.2.1 On-Crank Cleaning System The on-crank cleaning system only operates at gas turbine cranking speed with the fuel system and ignition system deactivated. The gas turbine cranking and cleaning solution activation can be initiated from the control console or turbine control junction box. 14.2.
Turbomachinery Package Specification 14.3 Titan 250 Generator Set Package Lifting Kit A package lifting kit can be shipped separately that contains slings, spreader bars, and assorted hardware to facilitate separate lifting of the driver and driven equipment modules with or without an export crate. 14.4 Engine Removal Equipment The Titan 250 package is equipped with an innovative system to remove the gas turbine as a complete entity or in sections (Figure 29).
Turbomachinery Package Specification Titan 250 Generator Set Table 12.
Turbomachinery Package Specification 15 Marinization 15.1 General Description Titan 250 Generator Set The Titan 250 generator sets may be operated in offshore oil and gas applications. Depending upon operating conditions and movement of the underlying support structure, optional package modifications may be required.
Turbomachinery Package Specification Titan 250 Generator Set 15.1.7 Certification Certification is typically required to demonstrate offshore turbomachinery compliance with applicable rules for a fixed or mobile offshore installation. Solar can provide the necessary certification or assist the customer in obtaining certification.
Turbomachinery Package Specification Titan 250 Generator Set 16 Quality Assurance and Testing 16.1 Quality Assurance Solar is an International Organization for Standards (ISO) 9000 company with ISO 9001:2000 and 9002 certification. Several Solar gas turbine models and manufacturing processes have been "type" certified. In recognition of Solar’s commitment to quality, Solar has received Manufacturing Resource Planning (MRP) II Class “A” certification and the Malcolm Baldrige National Quality Award.
Turbomachinery Package Specification Titan 250 Generator Set • Vibration measurements • Power and heat rate measurements at partial and full load under ambient conditions with a unity power factor of 1.
Turbomachinery Package Specification Titan 250 Generator Set 16.2.6 Source Inspection As an option, Solar can conduct a final product inspection at the supplier facility for the following contract-specific items: • • • • • Inlet system filter Inlet system silencer Exhaust system silencer Lube oil cooler Generator, including rotor balancing and standard generator testing 16.2.
Turbomachinery Package Specification Titan 250 Generator Set 17 Preservation, Installation, and Documentation 17.1 General Description This chapter describes preservation, general installation requirements, and project documentation. 17.2 Preservation Long term and short term preservation can be provided for the engine and package.
Turbomachinery Package Specification Titan 250 Generator Set 17.4.2 Alignment Tooling As an option, alignment tooling can be provided to align the reduction gearbox output shaft hub to the generator input shaft hub. The alignment tooling includes a dial indicator kit, gearbox-to-generator alignment tool, axial distance gauge, and custom storage container. 17.4.3 Lube Oil Cooler(s) The lube oil cooler(s) is/are not integral with the package and must be located and installed separately. 17.4.
Turbomachinery Package Specification Titan 250 Generator Set • Generator acceptance test report • American Society of Mechanical Engineers (ASME) data reports, as applicable • Solar’s Certificate of Compliance If specified on the final project ITP, the QC data book may also include the following documents at additional cost and increased delivery time: • Engine rotor balance record • Engine casing leak test record • Documentation from suppliers of major package components such as oil coolers, oil filters,
Turbomachinery Package Specification Titan 250 Generator Set • Graphics in a separate window for simultaneous viewing of text with associated illustration • PDF version for printing 17.5.5 Service Parts List Identifies operational service parts and tooling. Once engineering has been finalized and manufacturing bills are available, Solar's Service Parts department creates a detailed listing of service parts from the actual equipment manufacturing bills of material. Table 14.
Turbomachinery Package Specification 18 Certification 18.1 General Description Titan 250 Generator Set Solar’s leadership in the gas turbine industry is supported by its ability to comply with regulations, codes, and standards required by industry and/or regional authorities around the world. Solar continually evaluates compliance requirements to ensure conformance to the following standards: • • • • • • 18.
Turbomachinery Package Specification 18.4 Titan 250 Generator Set Conformité Européenne Mark For installations that require Conformité Européenne (CE) Mark certification, Solar complies with the CE Mark codes and standards adopted by local authorities and government entities.
Turbomachinery Package Specification 18.5 Titan 250 Generator Set International Electrotechnical Commission Safety Assessment International Electrotechnical Commission (IEC) 61508 is an international standard that describes a standardized approach to Asses the functional safety of electric, electronic, and programmable electronic safety-related systems. This standard is based on a lifecycle evaluation of system reliability and safety level determination.
Turbomachinery Package Specification 18.7 Titan 250 Generator Set Summary Solar has a continuing program to support customers in ensuring that Solar’s products conform to applicable codes and regulations. Solar also has the resources to provide customer guidance and assistance in this process. Table 16.
Turbomachinery Package Specification 19 Support Services 19.1 Construction Services Titan 250 Generator Set Solar’s Construction Services organization offers a comprehensive range of equipment and services to successfully meet power system expectations and needs. Our experience takes us to many parts of the world, onshore and offshore, managing various types of power configurations.
Turbomachinery Package Specification 19.3 Titan 250 Generator Set Contract Power and Leasing Services Solar offers numerous financing options. All or part of a project can be financed, offered under a lease agreement, or installed on a service tariff with a performance contract. Financing or leasing terms can extend from short-term rentals to long-term leases of 10 years or more.
Turbomachinery Package Specification Titan 250 Generator Set Conversion Chart Conversion Factors To Convert From English Btu Btu/h Btu/scf cfm cfm cu ft °F °F (Interval) ft ft-lbf/lbm ft/s gal. (U.S.) hp in. in. Hg in. H2O kcal lb lb/cu ft lbf-in. To S.I. Metric kJ W kJ/nm3 m3/min m3/s m3 °C °C (Interval) m mJ/kg m/s L kW mm kPa kPa kJ kg kg/m3 Multiply By 1.0551 0.2931 39.3694 0.028317 0.00047195 0.028317 (°F-32) 5/9 5/9 0.3048 0.0029891 0.3048 3.7854 0.7457 25.400 3.3769 0.2488 4.1868 0.4536 16.
Turbomachinery Package Specification Titan 250 Generator Set List of Abbreviations Abbreviations ABS1 ABS2 AGMA API AS/NZS ASME Ata ATEX AVM AVR Btu Btu/h BV CACA CACW CE CEC CEN CENELEC cfm CGCM cm cm2 cm3 CO CO2 CSA CT Cu ft °C dBA DNV ENTELA ES EU FM FP fps1 FPS2 FPSO ft-lb ft-lbf/lbm ft/s °F gal.
Turbomachinery Package Specification Titan 250 Generator Set Abbreviations (Cont.) HRSG IEC IEEE in. in. Hg in.
Turbomachinery Package Specification Titan 250 Generator Set Abbreviations (Cont’d) PF PIL PMG psi psia psig rpm RTD scf scfd scfm sm3/h SoLoNOx SP sq TEAAC TEWAC TLP UHC UL UPS USCG UV VAC VAR VDC VFD VPI * ** *** Power Factor Product Information Letter Permanent Magnet Generator Pounds/Square Inch Pounds/Square Inch Absolute Pounds/Square Inch Gauge Revolutions Per Minute Resistance Temperature Device Standard* Cubic Foot Standard* Cubic Feet/Day Standard* Cubic Feet/Minute Standard*** Cubic Meters/Hou
Turbomachinery Package Specification Titan 250 Generator Set List of Solar’s Engineering Specifications Solar’s Engineering Specifications ES 9-4 ES 9-56 ES 9-62 ES 9-76 ES 9-98 ES 9-224 ES 1593 ES 1762 ES 2231 ES 2416 Interpretation of Drawing Requirements Fusion Welding Ingestive Cleaning Solar Gas Turbine Engines Traceability Requirements Critical Parts, Engine and Related Systems Fuel, Air, and Water (or Steam) for Solar Gas Turbine Engines Lubricating Oils for Use In Solar Gas Turbine Engines Guidel