Product specifications

Device Management PROFIBUS & HART
3BDS011222-510 B 247
Channel Allocation on HART I/O Modules.
The following operations must be carried out to assign HART devices to defined
channel at the I/O module:
1. Open Plant Explorer.
2. Enable 800xA preview window, if applicable.
3. Switch to Control Structure.
4. Open the substructure below the Project object.
5. The HART devices have been added to Control Structure of Plant Explorer as
new objects under the parent modules, e.g. AI895. Select the Fieldbus
Management aspect on this I/O module object type.
6. The user interface of the Fieldbus Builder PROFIBUS/HART appears in the
preview window. The Fieldbus Builder PROFIBUS/HART copies the fieldbus
tree from Control Structure to its fieldbus tree in the main window. To improve
performance levels, the partial tree is not copied in its entirety.
7. Click "+" to open the next level of the partial tree.
8. All positioned HART devices, together with the channel information from the
I/O module object, appear in the partial tree.
The preview window is located in the right lower corner of 800xA Plant Explorer.
If the preview window is disabled, double-click the required aspects to access
them.
Figure 138. Fieldbus Management View