Product specifications

Device Management FOUNDATION Fieldbus
3BDS011222-510 B 281
Step 3: Configure the FF Application
For executing the desired automation function, FF blocks are linked together in an
FF Application. In the following example a simple control loop, which is controlled
by means of an external set point from the AC 800M controller, is configured in FF
devices.
1. Select an FF Application object in the Plant Explorer Control Structure
(refer to Figure 164).
2. Click Open Project in the selected FF Management aspect or via context
menu (refer to Figure 165).
Figure 164. Selection of the FF Application
Figure 165. FF Management Aspect