Product specifications

Appendix B Library Handling Creating a New Base Library
3BDS011222-510 B 547
4. Now a Library object is created for the new library and a Library Version object
for the first version of the library is created. The Library Version is also
inserted in the Object Type Structure, at the specified insertion point, refer to
Figure 340.
5. If you want the library to be an AC800 library, add a Library aspect (from the
AC800 Connect aspect system) to the Library Version object.
6. Now you can start to add your object types to the library below the Library
Version object in the Object Type Structure.
From Control Builder M
To create a new base library from Control Builder M Professional follow the steps
below:
1. In Project Explorer of Control Builder M Professional opened on your Control
Project select the Libraries folder.
2. On the Libraries folder (with right mouse click) create a new Library and give
it a name.
The following happens automatically in Plant Explorer:
The Library object and the Library Version object below is created in the
Library Structure below the Libraries folder object.
The Library Version object is inserted in the Object Type Structure below
Object Types/Control System/AC 800M\/C Connect / Libraries.
Figure 340. New Library Version in the Object Type Structure and Library Structure