Installation Instructions
v4-0919
Optional Spray Kit Installation
Be sure to have a licensed plumber facilitate connections of the water supply. Stub-up waterline where the Water Supply 
Tee will be located to enable connection. Priefert recommends 3/4" Sch40 PVC, sand sheathed, buried below freeze level.
After completing the assembly of the walker and round pen, determine a location closest to the water supply. 
Preferably, the water supply will be installed during the concrete pad preparation. This allows waterline to be run 
at the same time as electrical conduit (pg. 1). 
If necessary, a water supply may need to be brought to the location of the Horse Walker. If this is the case, water supply 
will have to be buried beneath the walker panels and dirt base. 
1. Prepare The Nozzles
  Unpack and identify all parts before beginning. 
  Assemble ten (10) Spray Nozzles (See Diagram 1). 
  Locate Poly Tube and cut ten (10) sections, 2" long. 
  Insert assembled Spray Nozzles fully into one end of each. 
  Locate eight (8) PVC Tee ttings and insert into the other end of eight (8) of the tubes on the Spray Nozzles. 
  Locate two (2) PVC 90˚ ttings, and insert them into the remaining two (2) Spray Nozzle tubes. 
  Locate the one (1) remaining Tee tting. This will be used for the connection to the water supply.
Spray Kit installs on the Inner Ring, 
along the rail at the top of the solid 
section of each panel, Nozzles facing 
outward. (See Diagram 2)
2. Assemble The Tubing
  Begin by determining where the closest panel 
connection is to the water supply. This will be 
the starting point to run tubing and nozzles from. 
Preferably, this will be opposite of the Bow Gate 
or generally centered between the two ends of 
the nished tubing assembly (See Diagram 2). 
  Connect the remaining Tee tting to one end of 
the Tubing. This Tee will connect to the  main 
water supply from the Anti-Siphon valve.
  Attach to the rail at the top of the solid section 
of the panel with supplied,  self-tapping, sheet 
metal screw and Tubing Strap (See Diagram 3). 
Use three  to ve Tubing Straps  per  panel  to  hold  Tubing securely.  Some  adjustment may  be  necessary after completing 
assembly. Add Tubing Straps as needed.
Note: Temporary tment can be done with plastic zip-ties. 
21
Diagram 1
Inner Ring
Bow Gate
4’ Panel
Inner Ring
Panels
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ Tee  
Nozzle
+ 90˚
Nozzle
+ 90˚
Water Supply
Tee
Outer Ring
Panels
Poly Tubing
Poly Tubing
STANDARD SPRAY KIT
NOZZLE & CONNECTOR
LOCATION
USE THIS DIAGRAM FOR REFERENCE ONLY
NOT TO SCALE
BEGIN ASSEMBLY HERE
Diagram 2
(6-Horse layout shown)










