1.
Concrete pad should follow the above specications.
2. Walker Base Assembly will sit on an anchor bolt pattern of 18" x 22". The 18" side will be the
front side with the door. Overall diameter of walker to the end of the arms is approx. 52' - (26' Radius).
When placing the walker, keep the end of the arms 10' to 12' feet from any obstruction.
IMPORTANT: IF factory provided Anchor Bolt Jig is NOT used in installation, use INDUSTRIAL GRADE 3/4" anchor bolts.
NOTE:
Top of pad should
be ush with ground or 1" above.
60"
60"
We Strongly Recommend using the included
Structural Anchor Bolt Jig
Concrete Pad Preparation
Panel Walker
and Lead Walker
Require
240 VAC 30 Amps.
See Page 11
for Electrical
Connections
HORSE WALKER CONCRETE PAD DIMENSIONS
Not to Scale
Approx. 4” of conduit above pad.
ADDITIONAL NOTE: If Optional Spray Kit is to be installed, waterline should be buried during this step of the
installation process. Priefert recommends Sch40 PVC buried below the freeze level for your location. Determine
the water supply location for the Spray Kit, and stub up and cap for that installation. (See Page 21)
IMPORTANT: Be sure to select an area that is large enough to accommodate the Horse Walker Outer Ring with
sucient clearance all around. Area should also be level, and if possible, slightly higher than surrounding terrain
to allow drainage, but not excessive runo. Avoid low-level areas which could lead to ponding, puddles and