Operating Instructions

Score Chute
Operating Instructions
(RC98SCOREAI)
Congratulations on purchasing Priefert’s new “SCORE” Chute.
This is the “Ultimate Training Chute”. In the fully automatic mode,
the rider can train his horse to respond to the rider’s que, NOT the
sound of the chute or the action of the steer. Having a well trained
horse is the key element for success, and the Score Chute helps
keep your horse competition ready.
Roping Chute Hook-Up
Step 1: Install a standard 1/4” NPT, male, quick-connect air tting
into hole marked air supply at back of the Automatic
Control Box (ACB). Be sure that the tting is the correct
size for the air line you intend to use. (See Diagram 1)
Step 2: Connect air supply to tting at the back of (ACB).
Set regulator on air compressor at 90 psi.
Proper performance requires a minimum of 2hp air compressor
that will produce 3.1 cfm at 90 psi, with a 4 gallon tank.
Step 3: Connect electrical cord to 110 volt outlet.
NOTICE: Priefert Manufacturing Recommends using a dedicated Air Compressor to prevent damage
from contamination to the Compressed Air System. Use Clean & Dry Compressed Air Supply.
Drain Compressor & Air Tanks Daily.
SEE ATTACHED NOTICE
DIAGRAM 1 - Insert Fitting
(Male, 1/4” NPT Quick-Connect Shown)
Automatic Control Box
MAIN POWER
INDICATOR
AUTOMATIC MODE
INDICATOR
GATE DELAY INDICATORGATE DELAY SETTING
AUTOMATIC MODE
ON/OFF SWITCH
110 VOLT
POWER CORD
AIR DISCHARGE MUFFLERS
COMPRESSED AIR
CONNECTION
(See Step 1)
OPMAN-RC98SCOREAI_1019

Summary of content (3 pages)