HOT CAPPUCCINO & COFFEE DISPENSER SERIES GB1K OCS-3 OPERATION MANUAL Specifications Installation & Operating instructions Adjustments Care & Maintenance Components Illustration Parts Identification Wiring Diagram Cecilware sells value…Worldwide th 45-05 20 Avenue, Long Island City, NY 11105 • 718-932-1414 FAX 718-932-7860 NC66A 12W96
Electrical Specifications 60 Kilo Watts 1.8 Number of Heaters 1 1 50/60 3.0 1 50/60 3.0 Model No. Volts Phase Hz GB1K, 120V 1 GB1K 120/240 GB1K 240 15 Receptacle Nema No. 5-15R 1 15 L14-20R** 20A 1 15 L6-20R* 20A Amps Circuit Breaker 15A 120V, 1.8 KW, 15A, Nema 5-15R standard on all models; 3.0 KW, 120/240V units available ** 120/240V, 3 pole, 4 wire grounding type Twist-Plug Receptacle. For 240V units. Use L6-20R, 2 pole, 3 Wire Twist-Plug Receptacle.
INSTALLATION REQUIREMENTS: This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes having jurisdiction. In addition: 1. A quick disconnect water connection or enough extra coiled tubing (at least the depth of the unit) so that the machine can be moved for cleaning underneath. 2. An approved back flow prevention device, such as a double check valve to be installed between the machine and the water supply. INSTALLATION & PRIMING: 1.
ITEM NO: DESCRIPTION 1 TANK TOP ASS'Y 2 TANK BAFFLE ASS'Y 3 TANK BAFFLE SEAL 4 TANK CLAMP ASS'Y 5 HEATER ELEMENT 1750W 120V 6 WASHER, FOR HEATER ELEMENT 7 NUT, FOR HEATER ELEMENT 8 TANK WELDMENT ASS'Y 9 ELBOW, MALE 1/8 NPT, WATER INLET FITTING 10 THERMOSTAT 11 HI-LIMIT (TEMPERATURE SAFETY GUARD) 12 DIRECT MOUNTING SEAL / SILICONE FITTING (.
MAINTENANCE INSTRUCTIONS (See Illustration A): LIT DISPLAY LAMP AND STARTER REPLACEMENT 1. To replace the lamp, first remove the upper inside door panel. Turn the lamp and pull it out of the lamp holder, then place the new lamp into the lamp holder and turn it until it snaps into position. 2. To replace the starter, remove the upper inside door panel, turn the starter slightly counter-clockwise and take it out of the starter base.
QUICK START-UP PROCEDURE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Flush inlet water line thoroughly before connecting. If pipe sealant is necessary, Teflon tape is commended. Connect water line to the 1/4" flare fitting located at rear of the unit. A shutoff valve in the water supply line is advisable. Turn on water. Check water line and fittings for leaks. Put HEATER Switch OFF. Plug the power cord into a grounded 120 volt, 60 Hz 15 Amp outlet. Single use. It will take 2 to 4 minutes to fill the tank.