Installation Instructions

Important
Before you begin, take the time to read this entire
guide to clearly understand the requirements and
steps to follow for proper installation.
Cedar Impressions
®
Individual Shingle products are
not designed for roof application. They are designed
solely for installation on vertical surfaces. The
shingles must be installed over a solid at substrate
with nail holding strength such as plywood or OSB
(minimum 7/16" thick). The wall itself must be at as
the shingles will follow the undulations in the wall.
Building codes and regulations vary throughout the
country. Be sure to check with your local code ofcial or
governing body for building requirements in your area.
Preparing Wall Surfaces
The key to successful siding application is proper
preparation of the wall and nailing surface. It is essential
that you work over a smooth/at nailing surface. The more
level and even the wall surface, the better the nished
installation will look. Shingles must be installed over a
solid substrate such as plywood or OSB.
Make sure sheathing is fastened securely to studs.
If you’re planning to use a conventional house wrap
or building felt, apply according to the manufacturers
recommendations. In all cases, however, install the
products so they are secured rmly to the substrate so
that they provide a smooth, even surface for the nal
siding installation.
Individual Shingles are exterior cladding; they are not a
complete weather resistant barrier. Before applying siding,
make certain the substrate is watertight. In order to be
protected from precipitation, the substrate may need to be
properly ashed around areas such as windows, doors,
other openings and corners so as to shed water to the
exterior. Refer to CertainTeed Installation Guide for proper
ashing around windows. The siding alone is not meant to
be a watertight barrier.
Tool and Fastener Requirements
Tools required
Fasteners
CertainTeed requires the use of stainless steel or other
equally corrosion-resistant fasteners. Failure to do so may
lead to early corrosion and leaching or staining on the
shingle surface which is not covered in the warranty.
Staples:
Stainless steel staples with 7/16" crown,
minimum 16 gauge, minimum 1-1/2" long
Nails:
Stainless steel or hot dipped galvanized roong
nails minimum 1-1/2" long, with minimum head
diameter of 5/16"
Screws:
Use stainless steel #6 (bugle or truss) head 1-1/2" long
screws. (for use with mitered outside corner)
NOTE: Check with your local code
ofcial or governing body for the building
requirements for fasteners in your area.
NOTE: Handle shingles carefully to avoid
scufng due to mishandling.
Installation Guidelines for Cedar Impressions Individual 5" Sawmill Shingles
Hammer
• Tape measure
Square
Chalk line
Level
Utility knife
Shears
Chop saw with sharp,
40-tooth carbide blade
• Air compressor
• Pneumatic stapler
Individual 5" Sawmill Shingles
Installation Instructions

Summary of content (6 pages)